AS9100D - Aerospace Quality Management System
Improvement (Clause 10)

AS9100D - Aerospace Quality Management System 10.2: Nonconformity and Corrective Action

React to nonconformities, evaluate need for action to eliminate causes, prevent recurrence.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 69 controls across 59 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 9001 · 3 controls

  • 1.1 SWIFT Environment Protection
  • 3.1 Physical Security
  • QMSR-820.10 Requirements for a Quality Management System - ISO 13485:2016 Sections 4-8 incorporation (§820.10)
  • QMSR-ISO13485-Sec8 Measurement, analysis and improvement (ISO 13485:2016 Section 8)

ISO/IEC 27003:2017 · 2 controls

ISO 14001:2015 · 1 control

  • 10.2 Nonconformity and corrective action

ISO 19011 · 1 control

ISO 22000 · 1 control

ISO 22000:2018 · 1 control

  • 10.1 Nonconformity and corrective action

ISO 22301:2019 · 1 control

  • 10.2 Continual improvement

ISO 27005 · 1 control

ISO 27701:2019 · 1 control

  • 5.8.1 Nonconformity and corrective action

ISO 30401 · 1 control

ISO 31000 · 1 control

ISO 37001 · 1 control

ISO 37001:2016 · 1 control

  • 10.1 Nonconformity and corrective action

ISO 37301 · 1 control

ISO 37301:2021 · 1 control

  • 10.2 Nonconformity and corrective action

ISO 45001 · 1 control

ISO 45001:2018 · 1 control

  • 10.2 Incident, nonconformity and corrective action
  • 10.1 Nonconformity and corrective action

ISO 55001 · 1 control

ISO 55001:2014 · 1 control

  • 10.1 Nonconformity and corrective action

ISO 56002 · 1 control

ISO 9001:2015 · 1 control

  • 10.2 Nonconformity and corrective action

ISO/IEC 27014:2020 · 1 control

ISO/IEC 42001:2023 · 1 control

  • 10.2 Nonconformity and corrective action

NIST SP 800-30 · 1 control

  • NISTSP30-8 Risk Assessment Maintenance, Continuous Monitoring, and Integration with the RMF

NIST SP 800-37 · 1 control

  • NISTSP37-7 RMF Monitor Step: Continuous Monitoring and Ongoing Authorisation

NIST SP 800-39 · 1 control

  • NISTSP39-5 Risk Monitoring: Effectiveness, Changes, Compliance, and Reassessment Triggers
  • PICSGMP-1 Chapter 1: Pharmaceutical Quality System (PQS) and Quality Risk Management
  • SAEIGHT-7 Management System, Worker Engagement, Continuous Improvement
  • 2.5.2 Verification Activities

South Korea ISMS-P · 1 control

  • UKOPRES-5 Third-Party Risk, Concentration Risk
  • VPSHR-3 Implementation Guidance and Reporting

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Query this from an agent

The graph holds this control, the 69 it maps to, and the evidence behind each claim, over MCP and REST.