Clause 10 addresses improvement + nonconformity + corrective action + problem solving + error proofing + continual improvement. Conceptual coverage: 10.1 General Improvement (continual improvement of suitability + adequacy + effectiveness of QMS); 10.2 Nonconformity and Corrective Action (react + evaluate + implement + review + update + retain documented info); 10.2.1 General + 10.2.2 Documented Info + 10.2.3 Problem Solving (IATF supplemental - documented process(es) for problem solving - 8D / DMAIC / Six Sigma / lean methodology / cause analysis / containment + interim + permanent + verification + horizontal expansion to similar products/processes/facilities); 10.2.4 Error Proofing (IATF supplemental - documented process for error proofing - poka-yoke / mistake-proofing - identification + implementation + verification + maintenance + records); 10.2.5 Warranty Management Systems + 10.2.6 Customer Complaints and Field Failure Test Analysis; 10.3 Continual Improvement (improvement opportunity + actions + monitoring + effectiveness) + 10.3.1 Continual Improvement Supplemental (documented process for continual improvement + use of statistical tools + analysis + projects + financial impact + customer satisfaction). Coordinates with AIAG-VDA FMEA + Six Sigma + Lean + Kaizen + Toyota Production System (TPS) + Industry 4.0. IATF 16949 Clause 10 Improvement + Nonconformity + Corrective Action + Problem Solving + Error Proofing + Continual Improvement applies.
This control maps to 146 controls across 76 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 146 it maps to, and the evidence behind each claim, over MCP and REST.