ISO 55001:2014
Improvement – ISO 55001:2014

ISO 55001:2014 10.1: Nonconformity and corrective action

If a nonconformity or incident arises in the organization's assets, in its asset management or in its asset management system, it responds, acting to control and correct it and dealing with the consequences. It then decides whether action is needed to remove the causes so the problem does not happen again or elsewhere, by reviewing it, finding out why it happened and checking whether similar problems exist or could arise; it takes the action needed; it checks whether that action worked; it changes the system where necessary; and it keeps documented information on what the nonconformities and incidents were, the actions taken and the outcomes.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 36 controls across 22 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 14001:2015 · 2 controls

  • 10.1 General
  • 10.2 Nonconformity and corrective action

ISO 22301:2019 · 2 controls

  • 10.1 Nonconformity and corrective action
  • 10.2 Continual improvement
  • ISO-22313-10.1 Nonconformity and corrective action
  • ISO22313-10.1 Guidance on nonconformity and corrective action

ISO 30401 · 2 controls

  • ISO30401-10.1 Nonconformity and corrective action
  • ISO30401-15 Nonconformity and corrective action
  • ISO-37002-10.1 Nonconformity and corrective action
  • ISO37002-10.2 Nonconformity and Corrective Action

ISO 37301:2021 · 2 controls

  • 10.1 Continual improvement
  • 10.2 Nonconformity and corrective action
  • ISO-39001-10.1 Nonconformity and corrective action
  • ISO39001-10.1 Nonconformity and Corrective Action
  • ISO-41001-10.1 Nonconformity and corrective action
  • ISO41001-10.1 Nonconformity and Corrective Action

ISO 45001:2018 · 2 controls

  • 10.1 General
  • 10.2 Incident, nonconformity and corrective action
  • ISO-50001-10.1 Nonconformity and corrective action
  • 10.1 Nonconformity and corrective action

ISO 55001:2024 · 2 controls

  • 10.2 Nonconformity and corrective action
  • 9.2.2 Internal audit programme

ISO 9001:2015 · 2 controls

  • 10.1 General
  • 10.2 Nonconformity and corrective action

ISO/IEC 27003:2017 · 2 controls

  • 27003-10.1 Nonconformity and Corrective Action
  • ISO27003-10.2 Continual improvement

ISO/IEC 42001:2023 · 2 controls

  • 10.1 Continual improvement
  • 10.2 Nonconformity and corrective action
  • AS9100D-10.2 Nonconformity and Corrective Action
  • SPC1-4.5.4 Nonconformity, Corrective and Preventive Action
  • STAR-NONCONF-01 Nonconformity and corrective action management

ISO 22000:2018 · 1 control

  • 10.1 Nonconformity and corrective action

ISO 27701:2019 · 1 control

  • 5.8.1 Nonconformity and corrective action
  • ISO28001-4.15 Nonconformity, corrective and preventive action

ISO 37001:2016 · 1 control

  • 10.1 10.1 Nonconformity and corrective action

ISO 56002 · 1 control

  • ISO-56002-10.2 Deviation, nonconformity and corrective action

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Improvement – ISO 55001:2014

You are reading one control. How much of ISO 55001:2014 have you already done?

ISO 55001:2014 10.1 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of ISO 55001:2014 your existing evidence covers. Hold ISO 55001:2024 and 27 of 27 ISO 55001:2014 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 0 were rejected on the ISO 55001:2024 pair alone.

Query this from an agent

The graph holds this control, the 36 it maps to, and the evidence behind each claim, over MCP and REST.