Level 1 EPSs and all their components are inspected weekly and Level 2 EPSs monthly (the 2025 differentiation), and the EPSS is exercised under load at least monthly. Use of the set for standby service or peak shaving may replace a scheduled run if it is recorded like a test.
This control maps to 6 controls across 4 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 6 it maps to, and the evidence behind each claim, over MCP and REST.