NFPA 70 National Electrical Code 2023 Article 700 Emergency Systems 700.3(B): 700.3(B) Periodic testing

Emergency systems must be tested periodically on a schedule the AHJ approves, to show they are maintained and in proper working order (2026: 700.4(B)).

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 4 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 8.3.3 8.3.3 Written maintenance and testing schedule
  • 8.4.1 8.4.1 Weekly or monthly inspection and monthly exercise
  • 8.4.9 8.4.9 Level 1 36-month test

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.