Level 1 equipment is inspected monthly and tested as the manufacturer recommends. Inspection covers clean and sound battery and charger equipment free of damaging conditions; electrolyte levels topped up where applicable; terminals and connectors cleaned and regreased and cell tops cleaned as needed; individual cell voltages and pilot-cell specific gravity checked and recorded where applicable; plate and sediment condition noted for flooded lead-acid cells in clear jars; lamps, meters and controls proven; and the load confirmed to be within the equipment rating.
This control maps to 3 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 3 it maps to, and the evidence behind each claim, over MCP and REST.