The EPSS is maintained so it can supply power within the type time and for the class duration. The programme starts immediately after acceptance testing or after repairs affecting reliability; the operational test after maintenance or repair is started at an ATS, covers each repaired component and moves each automatic and manual switch onto the alternate supply for 30 minutes or longer at operating temperature.