NFPA 70 National Electrical Code 2023 Article 701 Legally Required Standby Systems
Part I: General – NFPA 70 National Electrical Code 2023 Article 701 Legally Required Standby Systems

NFPA 70 National Electrical Code 2023 Article 701 Legally Required Standby Systems 701.3(B): 701.3(B) Periodic testing

Legally required standby systems must be tested periodically, in a way the AHJ approves, to show maintenance has been done and the system works.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 8.4.1 8.4.1 Weekly or monthly inspection and monthly exercise

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Part I: General – NFPA 70 National Electrical Code 2023 Article 701 Legally Required Standby Systems

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.