For Level 1 the EPS sits in a separate room with a 2-hour fire rating, or in an outdoor enclosure that resists snow and rain, with no unrelated equipment in the room; Level 1 EPSS equipment may not share a room with normal service equipment over 150 V to ground and 1000 A or more. EPSS rooms are placed and designed to limit flooding damage (including firefighting water and sewer backup) and supply interruption, the EPS keeps 0.9 m (36 in.) of access around the skid in the access direction (outdoor housings excepted), and failure of one converter should not stop others.
This control maps to 5 controls across 4 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 5 it maps to, and the evidence behind each claim, over MCP and REST.