NFPA 110-2025 Standard for Emergency and Standby Power Systems
Chapter 5: Emergency power supply: energy sources, converters and accessories – NFPA 110-2025 Standard for Emergency and Standby Power Systems

NFPA 110-2025 Standard for Emergency and Standby Power Systems 5.4: 5.4 Energy converter capacity

Once primary power fails, the converters must be large and quick enough to take the whole load inside the time Table 4.1(b) sets for the type, counted from primary power is lost.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 6 controls across 5 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 9.12-9.18 Secondary supply location and capacity, continuous rating and load shedding schedule
  • 9.70-9.75 Generator, engine and alternator specification: prime rating and load acceptance
  • 2.1.3 2.1.3 Selection of generating set rating from load characteristics
  • 700.4 700.4 Capacity and load management

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 5: Emergency power supply: energy sources, converters and accessories – NFPA 110-2025 Standard for Emergency and Standby Power Systems

Query this from an agent

The graph holds this control, the 6 it maps to, and the evidence behind each claim, over MCP and REST.