Level 1 converters must be designed, assembled and tested to keep the system working through bolted short circuits (phase to ground or neutral, phase to phase, three phase), motor-starting surges, lift operation, SCR controllers, X-ray equipment, overspeed, overtemperature, overload and adverse environments.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.