NASA NPR 7123.1D Systems Engineering Processes and Requirements

United States
vNPR 7123.1D (effective 5 July 2023, expires 5 July 2028)
4 domains
47 controls

NASA's systems engineering requirements: the 17 common technical processes, the technical team's duties on contracted work, life cycle and technical reviews with their minimum products, and the SEMP, technical performance measure and leading indicator duties, under Engineering Technical Authority governance.

Verified

NASA NPR 7123.1D Systems Engineering Processes and Requirements is a compliance framework from United States with 4 domains and 47 controls. The largest domains are Chapter 3: The 17 common technical processes – NASA NPR 7123.1D Systems Engineering Processes and Requirements (17 controls), Chapter 5: Life cycle and technical reviews – NASA NPR 7123.1D Systems Engineering Processes and Requirements (15 controls), Chapter 4: Systems engineering on contracted projects – NASA NPR 7123.1D Systems Engineering Processes and Requirements (8 controls). Every control below carries what it requires and what an assessor expects to see.

Maintained by Gerard Blokdyk

Framework summaries on this platform are interpretations grounded in the published source, for educational and compliance planning purposes. They do not reproduce or replace the official standards. Refer to the authoritative source for the definitive text. Framework names and trademarks belong to their respective organisations.

Framework Domains (4)

Chapter 3: The 17 common technical processes – NASA NPR 7123.1D Systems Engineering Processes and Requirements

17 controls
Controls in the Chapter 3: The 17 common technical processes – NASA NPR 7123.1D Systems Engineering Processes and Requirements domain of NASA NPR 7123.1D Systems Engineering Processes and Requirements: 17 controls
CodeTitle
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-07Identify and implement a stakeholder expectations definition process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-08Identify and implement a technical requirements definition process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-09Identify and implement a logical decomposition process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-10Identify and implement a design solution definition process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-11Identify and implement a product implementation process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-12Identify and implement a product integration process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-13Identify and implement a product verification process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-14Identify and implement a product validation process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-15Identify and implement a product transition process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-16Identify and implement a technical planning process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-17Identify and implement a requirements management process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-18Identify and implement an interface management process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-19Identify and implement a technical risk management process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-20Identify and implement a configuration management process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-21Identify and implement a technical data management process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-22Identify and implement a technical assessment process
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-23Identify and implement a decision analysis process

Chapter 4: Systems engineering on contracted projects – NASA NPR 7123.1D Systems Engineering Processes and Requirements

8 controls
Controls in the Chapter 4: Systems engineering on contracted projects – NASA NPR 7123.1D Systems Engineering Processes and Requirements domain of NASA NPR 7123.1D Systems Engineering Processes and Requirements: 8 controls
CodeTitle
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-24Define the engineering activities before, during and after the contract in the SEMP
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-25Establish the technical inputs to the solicitation
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-26Determine the technical work products the contractor must deliver
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-27Provide the insight and oversight requirements to the contracting officer
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-28Participate in evaluating offeror proposals
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-29Perform the contracted insight and oversight activities
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-30Participate in the reviews that finalise Government acceptance
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-31Participate in product transition as defined in the SEMP

Chapter 5: Life cycle and technical reviews – NASA NPR 7123.1D Systems Engineering Processes and Requirements

15 controls
Controls in the Chapter 5: Life cycle and technical reviews – NASA NPR 7123.1D Systems Engineering Processes and Requirements domain of NASA NPR 7123.1D Systems Engineering Processes and Requirements: 15 controls
CodeTitle
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-32Develop and document plans for life cycle and technical reviews
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-33Participate in the life cycle and technical reviews required by the governing NPR
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-34Participate in developing entrance and success criteria for each review
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-35aProvide the minimum products at the Mission Concept Review
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-35bProvide the minimum products at the System Requirements Review
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-35cProvide the minimum products at the Mission or System Definition Review
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-35dProvide the minimum products at the Preliminary Design Review
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-35eProvide the minimum product at the Critical Design Review
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-35fProvide the minimum products at the System Integration Review
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-35gProvide the minimum products at the Operational Readiness Review
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-35hProvide the minimum products at the Flight Readiness Review
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-35iProvide the minimum product at the Decommissioning Review
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-35jProvide the minimum product at the Disposal Readiness Review
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-57Monitor the technical effort through periodic technical reviews
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-65Develop and document an approach to human systems integration

Chapter 6: Systems Engineering Management Plan and technical team duties – NASA NPR 7123.1D Systems Engineering Processes and Requirements

7 controls
Controls in the Chapter 6: Systems Engineering Management Plan and technical team duties – NASA NPR 7123.1D Systems Engineering Processes and Requirements domain of NASA NPR 7123.1D Systems Engineering Processes and Requirements: 7 controls
CodeTitle
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-06ETA approval of the SEMP, waivers, deviations and key technical documents
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-58Define in the SEMP how the 17 processes are applied recursively across the system structure
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-59Keep technical and discipline plans consistent with the SEMP and integrated into the effort
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-60Establish technical performance measures that track current state against plan
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-61Report the technical performance measures to the programme or project manager at an agreed interval
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-62Include mass and power margins among the leading indicators
nasa-npr-7123-1d-systems-engineering-processes-and-requirements::SE-64Create and maintain review trends including closure of review action documentation

What is NASA NPR 7123.1D Systems Engineering Processes and Requirements and who does it apply to?

NASA NPR 7123.1D Systems Engineering Processes and Requirements is a compliance framework from United States with 4 domains and 47 controls. NASA's systems engineering requirements: the 17 common technical processes, the technical team's duties on contracted work, life cycle and technical reviews with their minimum products, and the SEMP, technical performance measure and leading indicator duties, under Engineering Technical Authority governance. It is used by organisations to establish and maintain compliance with industry standards and regulatory requirements.

What does NASA NPR 7123.1D Systems Engineering Processes and Requirements actually require?

NASA NPR 7123.1D Systems Engineering Processes and Requirements has 47 controls organised across 4 domains. The largest domains are Chapter 3: The 17 common technical processes – NASA NPR 7123.1D Systems Engineering Processes and Requirements (17 controls), Chapter 5: Life cycle and technical reviews – NASA NPR 7123.1D Systems Engineering Processes and Requirements (15 controls), Chapter 4: Systems engineering on contracted projects – NASA NPR 7123.1D Systems Engineering Processes and Requirements (8 controls). Each control defines specific requirements that organisations must implement to achieve compliance.

If I already comply with another framework, how much of NASA NPR 7123.1D Systems Engineering Processes and Requirements do I already cover?

NASA NPR 7123.1D Systems Engineering Processes and Requirements does not currently have cross-framework mappings in our system. Check back as we continuously expand our mapping database.

How do I implement NASA NPR 7123.1D Systems Engineering Processes and Requirements?

Start your NASA NPR 7123.1D Systems Engineering Processes and Requirements compliance journey by running a self-assessment on our platform to identify your current compliance posture. Our AI advisory can answer specific questions about NASA NPR 7123.1D Systems Engineering Processes and Requirements requirements, and cross-framework mapping helps you leverage existing controls from other frameworks you may already comply with. Create a free account to access all 47 controls and track your progress.

Start Your Compliance Journey

Create a free account to run self-assessments, get AI advisory, and track your compliance progress across 1,248 frameworks.

Get Started Free →

Free forever, no credit card required