NASA NPR 7123.1D Systems Engineering Processes and Requirements
Chapter 3: The 17 common technical processes – NASA NPR 7123.1D Systems Engineering Processes and Requirements

NASA NPR 7123.1D Systems Engineering Processes and Requirements SE-11: Identify and implement a product implementation process

What does SE-11 require?

The programme or project manager selects a product implementation process that the Engineering Technical Authority has approved and puts it into practice: its activities, requirements, guidelines and documentation are tailored and customised for realising a design solution by making, buying or reusing the end product at that product layer. The process produces the specified product, in the form the phase success criteria call for, so that it satisfies the design solution definition such as its drawings and specifications.

Maintained by Gerard Blokdyk

Other controls in Chapter 3: The 17 common technical processes – NASA NPR 7123.1D Systems Engineering Processes and Requirements

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.