Because technical leading indicators are the subset of technical performance measures that give insight into potential future states, the technical team ensures the set of measures includes mass margins for projects involving hardware and power margins for projects whose systems are powered.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.