NASA NPR 7123.1D Systems Engineering Processes and Requirements SE-35h: Provide the minimum products at the Flight Readiness Review

What does SE-35h require?

At the Flight Readiness Review the technical team provides the baseline verification and validation results and the final certification for flight or use.