NIST SP 800-53 Rev 5
SA - System and Services Acquisition

NIST SP 800-53 Rev 5 NIST800-SA-11: SA-11 Developer Testing and Evaluation

Require the developer of the system, system component, or system service, at all post-design stages of the system development life cycle, to: a. Develop and implement a plan for ongoing security and privacy control assessments; b. Perform [Selection (one or more): unit; integration; system; regression] testing/evaluation [Assignment: organization-defined frequency] at [Assignment: organization-defined depth and coverage]; c. Produce evidence of the execution of the assessment plan and the results of the testing and evaluation; d. Implement a verifiable flaw remediation process; and e. Correct flaws identified during testing and evaluation.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 71 controls across 28 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

NIST SP 800-218 · 10 controls

PCI DSS 4.0 · 6 controls

  • 11.4.1 11.4.1 Penetration testing methodology defined and implemented
  • 6.2.3 6.2.3 Code review before release
  • 6.2.3.1 6.2.3.1 Manual code review independence and approval
  • 6.3.1 6.3.1 Vulnerability identification and risk ranking
  • 6.3.2 6.3.2 Inventory of bespoke software and components
  • 6.5.3 6.5.3 Separate pre-production from production

CIS Controls v8 · 5 controls

  • CIS-16.12 Implement Code-Level Security Checks
  • CIS-16.13 Conduct Application Penetration Testing
  • CIS-16.14 Conduct Threat Modeling
  • CIS-18.2 Perform Periodic External Penetration Tests
  • CIS-18.5 Perform Periodic Internal Penetration Tests

ISO 27002:2022 · 5 controls

  • 8.25 Secure development life cycle
  • 8.28 Secure coding
  • 8.29 Security testing in development and acceptance
  • 8.31 Separation of development, test and production environments
  • 8.33 Test information
  • ASBv3-DS-4 Integrate static application security testing into DevOps pipeline
  • ASBv3-DS-5 Integrate dynamic application security testing into DevOps pipeline
  • ASBv3-PV-7 Conduct regular red team operations
  • DS-6 Enforce security of workload throughout DevOps lifecycle

EU AI Act · 4 controls

  • EUAI-Art.15 Accuracy, robustness and cybersecurity
  • EUAI-Art.17 Quality management system
  • EUAI-Art.43 Conformity assessment
  • EUAI-Art.60 Testing of high-risk AI systems in real world conditions outside AI regulatory sandboxes

FedRAMP High · 4 controls

  • CM-3(2) Testing, Validation, and Documentation of Changes
  • SA-11 Developer Testing and Evaluation
  • SA-11(1) Developer Testing and Evaluation | Static Code Analysis (SA-11(1))
  • SA-11(2) Developer Testing and Evaluation | Threat Modeling and Vulnerability Analyses (SA-11(2))

FedRAMP Moderate · 4 controls

  • CM-3(2) Testing, Validation, and Documentation of Changes
  • SA-11 Developer Testing and Evaluation
  • SA-11(1) Developer Testing and Evaluation | Static Code Analysis (SA-11(1))
  • SA-11(2) Developer Testing and Evaluation | Threat Modeling and Vulnerability Analyses (SA-11(2))
  • SEC11-BP02 Automate testing throughout the development and release lifecycle
  • SEC11-BP03 Perform regular penetration testing
  • SEC11-BP04 Conduct code reviews

C5 (Germany) · 2 controls

ISO 27001:2022 · 2 controls

  • 8.28 Secure coding
  • 8.29 Security testing in development and acceptance

ISO 27701:2019 · 2 controls

  • 6.11.1 Security requirements of information systems
  • 6.11.2 Security in development and support processes

NIST SP 800-160 · 2 controls

  • AUCDR-IS-4 Formal vulnerability management program
  • CFTC-SS-5 Systems Development and Quality Assurance Category

DORA · 1 control

ISO/IEC 42001:2023 · 1 control

  • A.6.2.4 AI system verification and validation
  • NIST-CSF-PR.PS-06 Secure software development practices are integrated, and their performance is monitored throughout the software development life cycle

NIST SP 800-172 · 1 control

  • 3.14.7e Verify Correctness of Security Functions
  • SA-11 SA-11 Developer Testing and Evaluation
  • SA-11 SA-11 Developer Testing and Evaluation
  • 53A-2.1 Assessments Within the System Development Life Cycle

SOC 2 · 1 control

  • SOC2-CC8.1 CC8.1 Managing changes to procedures, software, data and infrastructure

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in SA - System and Services Acquisition

You are reading one control. How much of NIST SP 800-53 Rev 5 have you already done?

NIST SP 800-53 Rev 5 NIST800-SA-11 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of NIST SP 800-53 Rev 5 your existing evidence covers. Hold ISO 27001:2022 and 163 of 1014 NIST SP 800-53 Rev 5 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 342 were rejected on the ISO 27001:2022 pair alone.

Query this from an agent

The graph holds this control, the 71 it maps to, and the evidence behind each claim, over MCP and REST.