FedRAMP Moderate
SA - System and Services Acquisition

FedRAMP Moderate SA-11(1): Developer Testing and Evaluation | Static Code Analysis. Require the developer of the system, system component, or system service to employ static code analysis tools to identify common flaws and document the results of

Developer Testing and Evaluation | Static Code Analysis. Require the developer of the system, system component, or system service to employ static code analysis tools to identify common flaws and document the results of

Other controls in SA - System and Services Acquisition

You are reading one control. How much of FedRAMP Moderate have you already done?

FedRAMP Moderate SA-11(1) is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of FedRAMP Moderate your existing evidence covers. Hold ISO 27002:2022 and 182 of 323 FedRAMP Moderate controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 348 were rejected on the ISO 27002:2022 pair alone.

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.