NIST SP 800-218
NIST SP 800-218: Asset Management

NIST SP 800-218 SP800-218-PW.1.2: Track Security Requirements, Risks, and Decisions

Track and maintain the software's security requirements, risks, and design decisions.

What else in your programme already covers this

This control maps to 27 controls across 15 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

NIST SP 800-53 Rev 5 · 4 controls

  • NIST800-SA-11 Developer testing and evaluation
  • NIST800-SA-15 Development process, standards, and tools
  • NIST800-SA-17 Developer Security and Privacy Architecture and Design. Require the developer of the system, system component, or system service to produce a design specification and security and privacy architecture that: Is consistent with the organization's
  • NIST800-SA-8 Security and privacy engineering principles

ISO/IEC 42001:2023 · 3 controls

  • 6.1.2 Risk assessment
  • 7.5.3 Control of documented information
  • A.6.2.3 Documentation of AI system design and development

NIST SP 800-161 Rev 1 · 3 controls

BSIMM · 2 controls

  • AM1.2 Create a data classification scheme and inventory
  • AM1.5 Gather and use attack intelligence

C5 (Germany) · 2 controls

  • C5-DEV-05 Risk assessment, categorisation and prioritisation of changes
  • C5-OIS-06 Risk Management Policy
  • NIST-CSF-ID.RA-05 Threats, vulnerabilities, likelihoods, and impacts are used to understand inherent risk and inform risk response prioritization
  • NIST-CSF-ID.RA-07 Changes and exceptions are managed, assessed for risk impact, recorded, and tracked

SOC 2 · 2 controls

  • SOC2-CC8.1 Change management processes are in place
  • SOC2-PI1.1 Obtains or generates and uses relevant quality information to support processing integrity
  • SEC01-BP07 Identify threats and prioritize mitigations using a threat model

FedRAMP High · 1 control

  • SA-4(2) Acquisition Process | Design and Implementation Information for Controls. Require the developer of the system, system component, or system service to provide design and implementation information for the controls that includes: [Selection (one or

FedRAMP Moderate · 1 control

  • SA-4(2) Acquisition Process | Design and Implementation Information for Controls. Require the developer of the system, system component, or system service to provide design and implementation information for the controls that includes: [Selection (one or

ISO 27001:2022 · 1 control

  • 8.26 Application security requirements

ISO 27002:2022 · 1 control

  • 8.26 Application security requirements

NIST SP 800-172 · 1 control

  • 3.11.4e Security Solution Rationale Document

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in NIST SP 800-218: Asset Management

You are reading one control. How much of NIST SP 800-218 have you already done?

NIST SP 800-218 SP800-218-PW.1.2 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of NIST SP 800-218 your existing evidence covers. Hold NIST SP 800-53 Rev 5 and 30 of 42 NIST SP 800-218 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 0 were rejected on the NIST SP 800-53 Rev 5 pair alone.

Query this from an agent

The graph holds this control, the 27 it maps to, and the evidence behind each claim, over MCP and REST.