NIST SP 800-53 Rev 5 HIGH
SA: System and Services Acquisition – NIST SP 800-53 Revision 5.1 HIGH

NIST SP 800-53 Rev 5 HIGH SA-11: SA-11 Developer Testing and Evaluation

Require the developer of the system, system component, or system service, at all post-design stages of the system development life cycle, to: a. Develop and implement a plan for ongoing security and privacy control assessments; b. Perform [Selection (one or more): unit; integration; system; regression] testing/evaluation [Assignment: organization-defined frequency] at [Assignment: organization-defined depth and coverage]; c. Produce evidence of the execution of the assessment plan and the results of the testing and evaluation; d. Implement a verifiable flaw remediation process; and e. Correct flaws identified during testing and evaluation.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 3 controls across 3 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

FedRAMP High · 1 control

  • SA-11 Developer Testing and Evaluation

FedRAMP Moderate · 1 control

  • SA-11 Developer Testing and Evaluation

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in SA: System and Services Acquisition – NIST SP 800-53 Revision 5.1 HIGH

Query this from an agent

The graph holds this control, the 3 it maps to, and the evidence behind each claim, over MCP and REST.