Where two or more sets are paralleled the system must not connect loads that could damage the EPS; each transfer switch has continuous and interrupting ratings for its loads and withstands the available fault current; first priority loads go on the bus as soon as emergency power is available, further loads are added in priority as each set closes, and on loss of a set load is shed automatically from lowest priority upward so the highest priority load is last affected.