Overcurrent devices must be selected so a fault on one circuit does not impair others; sources not meant to run in parallel must be prevented from being connected together (for example by switching or mechanical interlocks); a single emergency set may supply other loads only with precautions that keep supply to safety and essential services unaffected under all conditions, and where several sources exist, other loads may be supplied only if the remaining sources can still carry all safety and essential services when one fails, which usually means automatic load shedding.
This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.