AS/NZS 3010:2017 Electrical Installations Generating Sets
Section 2: General requirements for the installation of generating sets – AS/NZS 3010:2017 Electrical Installations Generating Sets

AS/NZS 3010:2017 Electrical Installations Generating Sets 2.4.3: 2.4.3 Synchronization with the network or other sets

Where sets are synchronised with a distributor's network the distributor's synchronising requirements must be obtained (most need a formal agreement for parallel operation). Automatic controls must keep output voltage and frequency synchronised with the normal supply during transfer or extended parallel running, or with other sets in a multiple-set installation, and synchronisation check controls must be fitted on every connection or changeover device used for paralleling, so it cannot close across unsynchronised sources.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 6.3 6.3 Requirements for paralleled generator sets

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.