NFPA 111-2025 Standard on Stored Electrical Energy Emergency and Standby Power Systems 6.3: 6.3 Load switching and load shedding

When connected load exceeds ECE capacity, controls must automatically drop pre-identified noncritical loads or transfer to bypass. Transfer switches carry continuous and interrupting ratings for all load classes and withstand available fault current. Highest priority loads go to the emergency bus first, lower priorities follow while the bus is not overloaded; if a power module drops out and the rest cannot carry the load, loads are shed in reverse priority in proportion to the lost capacity, stopping once demand matches remaining capacity.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 6.3 6.3 Requirements for paralleled generator sets

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 6: Transfer switches and protection – NFPA 111-2025 Standard on Stored Electrical Energy Emergency and Standby Power Systems

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.