NIST SP 800-145
Essential Characteristics - Elasticity

NIST SP 800-145 NISTSP145-3: Rapid Elasticity Characteristic and Capacity Management

Verify and document that a cloud service exhibits the Rapid Elasticity characteristic per NIST SP 800-145 Section 2: capabilities can be elastically provisioned and released, in some cases automatically, to scale rapidly outward and inward commensurate with demand. To the consumer the capabilities available for provisioning often appear to be unlimited and can be appropriated in any quantity at any time. Document the elasticity automation mechanism (autoscaling group, horizontal pod autoscaler, serverless concurrency), the provisioning latency target, the maximum tested scale, and the cost-control guardrails. Address the elastic threat surface (quota exhaustion, denial of wallet, runaway autoscaling) in the architecture risk register.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 136 controls across 55 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • CH-FADP-19 Transparency and proactive information
  • CH-FADP-21 Data protection impact assessments
  • FADP-16 FDPIC Independence and Functions
  • FADP-7 Data Protection Impact Assessment (Articles 9-10)
  • FADP-9 Data Protection Advisor (Articles 14-15)
  • ASD37-27 Outbound data loss prevention (Very Good)
  • ASD37-34 Regular backups (Essential)
  • ASD37-35 Business continuity and disaster recovery plans (Very Good)
  • ASD37-36 System recovery capabilities (Very Good)
  • IM8-DAT.2 Data Protection
  • IM8-DAT.4 Data Retention and Disposal
  • IM8-RES.2 Disaster Recovery
  • IM8-RES.4 Resilience Testing

API 1164 · 3 controls

  • API1164-17 Wireless and Field Communications
  • API1164-18 Field Device Security
  • API1164-19 Safety Instrumented Systems Interface
  • AT-DSG-10 Section 29 - Liability and right to compensation / civil jurisdiction
  • AT-DSG-12 Section 62 - Administrative penalties
  • AT-DSG-7 Section 18 - Establishment of the Data Protection Authority

GDPR · 3 controls

IEC 62443 · 3 controls

  • IEC62443-16 Incident response plan for operational disruptions
  • IEC62443-17 Recovery plan for critical systems
  • IEC62443-20 Exercises and drills for OT incidents

ISO 27799:2025 · 3 controls

  • ISO27799-03 Minimum necessary standard enforcement
  • ISO27799-04 Patient data de-identification procedures
  • ISO27799-05 Audit trail for ePHI access

ISO/IEC 27011:2024 · 3 controls

  • 27011-5.2 Information Security Roles in Telecoms
  • 27011-6.3 Awareness and Training
  • 27011-8.6 Data protection and backup

ISO/IEC 27019:2024 · 3 controls

  • ISO27019-16 Incident response plan for operational disruptions
  • ISO27019-18 Reporting obligations to authorities
  • ISO27019-20 Exercises and drills for OT incidents

ISO/IEC 27031:2011 · 3 controls

  • 27031-8.1 Exercising and Testing
  • 27031-8.2 Maintaining IRBC
  • 27031-9.3 Management Review
  • NIST-CSF-RC.RP-01 The recovery portion of the incident response plan is executed once initiated from the incident response process
  • NIST-CSF-RC.RP-06 The end of incident recovery is declared based on criteria, and incident-related documentation is completed
  • NIST-CSF-RS.MA-05 The criteria for initiating incident recovery are applied
  • NISTPF-4 Communicate-P - Privacy Notice, Transparency, and Individual Awareness
  • NISTPF-7 Protect-P Maintenance and Protective Technology (PR.MA-P, PR.PT-P)
  • NISTPF-8 Protect-P Information Protection Processes (PR.PO-P)
  • AZ-DPA-15 Article 17 - Dispute resolution
  • AZ-DPA-6 Article 6 - State regulation in personal data protection

Bahrain PDPL · 2 controls

  • BB-DPA-1 Section 1 - Short Title
  • BB-DPA-4 Section 4 - Principles Relating to Processing
  • UAE-PDPL-Art.10 Data Protection Officer (DPO) (UAE PDPL Article 10)
  • UAE-PDPL-Art.18_19_20_21 Security measures, controller/processor relationship, DPIA (UAE PDPL Articles 18-21)

ISO 22316 · 2 controls

  • ISO22316-08 Recovery time and point objectives
  • ISO22316-12 Recovery strategy for critical activities

ISO/IEC 27400:2022 · 2 controls

  • 27400-7.1 Network Security for IoT
  • 27400-7.4 Data retention and deletion

ISO/TS 22317:2021 · 2 controls

  • ISO22317-08 Recovery time and point objectives
  • ISO22317-12 Recovery strategy for critical activities

ISO/TS 22318:2021 · 2 controls

  • ISO22318-08 Recovery time and point objectives
  • ISO22318-12 Recovery strategy for critical activities
  • NFPA1600-5.3 Resource Needs Assessment
  • NFPA1600-6.4 Continuity and Recovery
  • NISTSP34-2 Business Impact Analysis (BIA): Critical Resources, Recovery Priorities
  • NISTSP34-4 Information System Contingency Plan (ISCP) Development
  • NDPA-1 Applicability, Scope, and Carve-Outs
  • NDPA-4 Sensitive Data Processing Consent and Childrens Protections
  • NJDPA-7 Data Protection Assessments and Processor Contracts
  • NJDPA-8 AG Platkin Enforcement, 18-Month Cure Sunset, and Division of Consumer Affairs
  • PAKPDPB-6 Cross-Border Transfer and Data Localization
  • PAKPDPB-7 NCPDP, Registration, Records, Processor Contracts, DPO
  • AUPRV-1 APP 1 Open and Transparent Management + Privacy Management Framework
  • AUPRV-6 Sensitive Information, PIA, Privacy by Design, Children

South Korea ISMS-P · 2 controls

  • ISMSP-PI-06 Personal Information Destruction
  • ISMSP-SYS-06 Business Continuity and Disaster Recovery
  • D.1 Incident Response Planning
  • D.3 Backup and Recovery
  • VERMONTAICDA-3 Bias Testing, Discrimination Prevention, Transparency
  • VERMONTAICDA-4 Vermont AG Enforcement and Cure
  • 4.4.8 Business Continuity and Recovery
  • AL-DPA-14 Direct Marketing
  • DIQ-1 Data Integration and Interoperability
  • FFIEC-12 Disaster recovery procedures
  • FTC-Safeguards-9-Elements 9 Safeguard Elements - Access, Inventory, Encryption, Secure-Dev, MFA, Disposal, Change-Mgmt, Monitoring, Pen-Test (16 CFR 314.4(c))

FedRAMP Rev 5 · 1 control

  • FEDRAMP-CP-9 System Backup
  • FDBR-ControllerObligations-DPA-Notice Controller + Processor Obligations + Data Protection Assessments (Fla. Stat. 501.707, 501.708, 501.71, 501.711)

ISO 22320:2018 · 1 control

  • ISO-22320-5.2 Incident management process

ISO 26000:2010 · 1 control

  • ISO-26000-6.7 Consumer issues

ISO/IEC 23894:2023 · 1 control

  • ISO23894-A.5 Privacy and Data Protection in AI

ISO/IEC 27043:2015 · 1 control

  • ISO27043-23 Backup and recovery procedures

ISO/SAE 21434 · 1 control

  • ISO21434-23 Backup and recovery procedures

OWASP ASVS · 1 control

OWASP MASVS · 1 control

  • OWASPMASVS-7 MASVS-RESILIENCE: Resilience Against Reverse Engineering
  • RUSPD-4 Special Categories, Biometric Data

South Korea PIPA · 1 control

  • PIPA-CPO-DPO-Privacy-Officer-PIA-Personal-Information-Impact-Assessment-Articles-31-33 Korea PIPA CPO + DPO + Privacy Officer + PIA + Personal Information Impact Assessment + Articles 31-33

Turkey KVKK · 1 control

  • TURKEYKVKK-3 Special Categories and Sensitive Data
  • CPSC-CS.3 Data Protection for Safety Systems
  • VIETNAMCYBER-4 Incident Reporting and Cooperation

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Query this from an agent

The graph holds this control, the 136 it maps to, and the evidence behind each claim, over MCP and REST.