UK Defence Standard 05-138 - Cyber Security for Defence Suppliers
DEFSTAN 05-138 Section D: Minimising the Impact of Incidents

UK Defence Standard 05-138 - Cyber Security for Defence Suppliers D.3: Backup and Recovery

The supplier must maintain regular off-line backups of data off-site to enable recovery from cyber incidents.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 125 controls across 75 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

API 1164 · 3 controls

  • API1164-17 Wireless and Field Communications
  • API1164-18 Field Device Security
  • API1164-19 Safety Instrumented Systems Interface
  • ASD37-34 Regular backups (Essential)
  • ASD37-35 Business continuity and disaster recovery plans (Very Good)
  • ASD37-36 System recovery capabilities (Very Good)

FedRAMP Rev 5 · 3 controls

  • FEDRAMP-CP-9 System Backup
  • FedRAMP-Boundary Authorization Boundary, SSP, SAR, POA&M documentation
  • FedRAMP-IncidentReporting FedRAMP incident reporting to PMO and US-CERT

IEC 62443 · 3 controls

  • IEC62443-16 Incident response plan for operational disruptions
  • IEC62443-17 Recovery plan for critical systems
  • IEC62443-20 Exercises and drills for OT incidents

ISO/IEC 27019:2024 · 3 controls

  • ISO27019-16 Incident response plan for operational disruptions
  • ISO27019-18 Reporting obligations to authorities
  • ISO27019-20 Exercises and drills for OT incidents

ISO/IEC 27031:2011 · 3 controls

  • 27031-8.1 Exercising and Testing
  • 27031-8.2 Maintaining IRBC
  • 27031-9.3 Management Review
  • NIST-CSF-RC.RP-01 The recovery portion of the incident response plan is executed once initiated from the incident response process
  • NIST-CSF-RC.RP-06 The end of incident recovery is declared based on criteria, and incident-related documentation is completed
  • NIST-CSF-RS.MA-05 The criteria for initiating incident recovery are applied

NIST SP 1800-32 · 3 controls

  • PICERL-C2 System Backup
  • PICERL-R1 System Restoration
  • PICERL-R2 Security Verification
  • SSAE18-A1.2 A1.2 - Environmental Protections and Recovery
  • SSAE18-A1.3 A1.3 - Recovery Plan Testing
  • SSAE18-CC7.5 CC7.5 - Incident Recovery
  • IMO-MSC-FAL-Recover-BackupRestore-ContinuityOfNavigation-LessonsLearned-Drills IMO MSC-FAL Recover Function - Backup and Restore + Continuity of Navigation + Continuity of Cargo Operations + Continuity of Propulsion + Lessons Learned + Drills + Resilience
  • IMO-MSC-FAL-Respond-IncidentResponse-Communication-FlagState-PortAuthority-CIRT-USCGNVIC IMO MSC-FAL Respond Function - Incident Response Plan + Containment + Communication + Flag State + Port Authority + USCG NVIC + Class Society Notification + CIRT

ISO 22316 · 2 controls

  • ISO22316-08 Recovery time and point objectives
  • ISO22316-12 Recovery strategy for critical activities

ISO/TS 22317:2021 · 2 controls

  • ISO22317-08 Recovery time and point objectives
  • ISO22317-12 Recovery strategy for critical activities

ISO/TS 22318:2021 · 2 controls

  • ISO22318-08 Recovery time and point objectives
  • ISO22318-12 Recovery strategy for critical activities
  • NFPA1600-5.3 Resource Needs Assessment
  • NFPA1600-6.4 Continuity and Recovery

NIST SP 800-53 Rev 5 · 2 controls

SOC 2 · 2 controls

  • SOC2-A1.2 A1.2 Environmental protection, backup and recovery infrastructure
  • SOC2-A1.3 A1.3 Testing recovery plan procedures
  • IM8-RES.2 Disaster Recovery
  • IM8-RES.4 Resilience Testing

South Korea ISMS-P · 2 controls

  • ISMSP-PI-06 Personal Information Destruction
  • ISMSP-SYS-06 Business Continuity and Disaster Recovery
  • 4.4.8 Business Continuity and Recovery
  • DIQ-1 Data Integration and Interoperability
  • FFIEC-12 Disaster recovery procedures
  • FIRST-CSIRTF-SA2-ISIM Service Area 2 - Information Security Incident Management (Intake, Analysis, Containment, Recovery, Coordination, Crisis)
  • GAMP5-Supplier-Operations-Change-Periodic Supplier Assessment, Operational Phase, Change Control and Periodic Review

GLBA · 1 control

  • GLBA-Subordinate-Rules-Operationalisation GLBA Operationalisation through FTC Safeguards Rule, Privacy Rule, SEC Reg S-P and Banking-Agency Guidelines

HKMA SPM · 1 control

  • HKMA-SPM-OR-RR-SA-OperationalResilience HKMA SPM Operational Risk (OR-1), Operational Resilience (OR-2), Recovery Planning (RR-1), Outsourcing (SA-2)
  • IACS-UR-E26-Respond-Recover-IncidentResponse-Recovery-Backup-Lessons IACS UR E26 Respond + Recover Goals - Incident Response + Communication + Recovery + Backup + Lessons Learned

IEEE 1686 · 1 control

  • IEEE1686-IR-Recovery-Reporting-Exercises-Drills-RECOV IEEE 1686 - Incident Response + Recovery from Failed Update + Reporting to Authorities + Coordination with Sector-Specific Agencies + Exercises and Drills

ISMAP (Japan) · 1 control

ISO 22320:2018 · 1 control

  • ISO-22320-5.2 Incident management process

ISO/IEC 27011:2024 · 1 control

  • 27011-8.6 Data protection and backup

ISO/IEC 27043:2015 · 1 control

  • ISO27043-23 Backup and recovery procedures

ISO/SAE 21434 · 1 control

  • ISO21434-23 Backup and recovery procedures
  • JP-FSA-CYB-Incident-Response-Playbooks-Containment-Eradication-Recovery-Post-Mortem-Tabletop-CSIRT Japan FSA Cybersecurity Incident Response + Playbooks + Containment + Eradication + Recovery + Post-Mortem + Tabletop Exercises + CSIRT + FSA Notification + Customer Communication + Forensics + Lessons Learned

MITRE ATT&CK · 1 control

MITRE D3FEND · 1 control

MTCS (Singapore) · 1 control

  • MTCS-Acquisition-Development-Maintenance-Supplier-Vulnerability-DevSecOps-SBOM-SDLC-SCA-API-Container MTCS Acquisition + Development + Maintenance + Supplier + Vulnerability + DevSecOps + SBOM + SDLC + SCA
  • MAS-TRM-Reliability-Data-Centre-Chapters-7-8-RTO-RPO-BCP-DR-System-Availability-4-Hours-12-Months MAS TRM Reliability + Data Centre + Chapters 7-8 + RTO + RPO + BCP + DR + System Availability 4 Hours 12 Months
  • NABERS-3 NABERS Water Performance Rating
  • NAIC-5 Third Party Service Provider Oversight - Section 4(F)(3) and Section 5

NERC CIP · 1 control

  • NERCCIP-6 Incident Reporting and Response Planning + Recovery Plans (CIP-008 + CIP-009)
  • NISTPF-8 Protect-P Information Protection Processes (PR.PO-P)
  • NISTSP115-8 Operational Considerations - Tools, Reporting Templates, ISMS Integration, Annex Material

NIST SP 800-123 · 1 control

  • NISTSP123-5 Server Operations - Patching, Malware, Logging, Backup

NIST SP 800-137 · 1 control

  • NISTSP137-7 Incident Response Integration and Ongoing Authorization

NIST SP 800-144 · 1 control

  • NISTSP144-6 Availability, Resilience, BCP/DR, and SLA Management

NIST SP 800-145 · 1 control

  • NISTSP145-3 Rapid Elasticity Characteristic and Capacity Management

NIST SP 800-146 · 1 control

  • NISTSP146-7 Service Level, Performance, Reliability, Interoperability, and Portability

NIST SP 800-190 · 1 control

  • NISTSP61-5 Containment, Eradication, and Recovery

NIST SP 800-63-4 · 1 control

  • NISTSP63R4-4 Authenticator Lifecycle: Binding, Recovery, Replacement, Suspension, Revocation
  • NISTSP82-7 OT Incident Response, Forensics, Recovery, and Continuity

NIST SP 800-88 · 1 control

  • NISTSP88-5 Media Inventory, Tracking, Chain of Custody, and Sanitization Records

NIST SP 800-92 · 1 control

  • NISTSP92-6 Log Retention: Policy, Tiered Storage, Backup, Secure Disposal, Legal Hold
  • NGCB-6 Incident Response, 72-Hour NGCB Notification, and Independent Investigation

OSFI B-13 · 1 control

  • OSFIB13-3 Cyber Security: Identification, Protection, Detection, Response, Recovery

OWASP MASVS · 1 control

  • OWASPMASVS-7 MASVS-RESILIENCE: Resilience Against Reverse Engineering

OWASP SAMM · 1 control

  • OWASPSAMM-5 Operations: Incident Management, Environment Management, Operational Management
  • OMANCS-7 Business Continuity, Disaster Recovery, and Resilience
  • OPENBANK-8 Incident Detection, Response, Customer Notification, Post-Incident Review, BCM

OpenSSF Scorecard · 1 control

  • OSSFSC-8 Project Maintenance, Sustainability, Integration with Supply Chain Security

PCI P2PE · 1 control

  • PCI-P2PE-12 Disaster recovery procedures

PCI PIN Security · 1 control

  • PCI-PIN-12 Disaster recovery procedures

PCI SSF · 1 control

  • PCI-SSF-12 Disaster recovery procedures

PSD2 SCA · 1 control

  • PSDTWO-2 SCA Exemptions and Risk-Based Authentication

PTES · 1 control

  • PTESPHASE-3 Threat Modeling
  • SHAREASSESS-4 Vulnerability Management, Patching, Application Security

SLSA · 1 control

  • SUPCHAIN-2 Source Integrity - Branch Protection, Code Review, Two-Person Rule
  • TSAPIPE-2 OT/IT Network Segmentation and Access Control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in DEFSTAN 05-138 Section D: Minimising the Impact of Incidents

Query this from an agent

The graph holds this control, the 125 it maps to, and the evidence behind each claim, over MCP and REST.