IS 14489:2018 Occupational Safety and Health Audit Code of Practice
Annex C: Audit checklist elements for the audited OH&S system – IS 14489:2018 Occupational Safety and Health Audit Code of Practice

IS 14489:2018 Occupational Safety and Health Audit Code of Practice C-18: Change management and mechanical integrity

What does C-18 require?

For management of change the audit checks written procedures for changes to process chemicals, technology, equipment, procedures and facilities that require, before any change, the technical basis, the effect on safety and health, changes to operating procedures, the time needed and authorization; that operating, maintenance and contract employees affected are informed and trained before start-up; and that safety information and procedures are updated. For mechanical integrity it checks a programme covering pressure vessels, tanks, piping, relief and vent systems, emergency shutdown, pumps and controls, written maintenance procedures, trained maintenance staff, inspections and tests at frequencies meeting manufacturer advice and good engineering practice (more often where experience shows need), correction of out-of-limit deficiencies before further use, quality assurance during fabrication and installation, and suitable maintenance materials and spares.

Maintained by Gerard Blokdyk

Other controls in Annex C: Audit checklist elements for the audited OH&S system – IS 14489:2018 Occupational Safety and Health Audit Code of Practice

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.