Control measures must be maintained so they remain fit for purpose, suitable for the work and correctly installed, set up and used (r 37), and reviewed and revised as needed (r 38): when they no longer control the risk, before a change likely to create new or different risks, when a new hazard or risk is identified, when consultation shows it is needed, or when an HSR requests it. A change includes changes to the workplace, the work environment, a system of work, process or procedure. Reviewing also asks whether a higher order control has become reasonably practicable. When controls are reviewed, any SWMS for high risk construction work and any WHS management plan must also be reviewed and revised where necessary.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.