Cross-Framework Mapping

NIST SP 800-53 Rev 5vsPTES

See exactly how NIST SP 800-53 Rev 5 controls map to PTES. Pre-computed mappings, identified gaps, and coverage analysis.

27
Controls Mapped
987
Gaps Found
3%
Coverage

Need this as a report you can hand to an assessor? A coverage crosswalk for this pair can be built to order.

According to the TheArtOfService Compliance Knowledge Graph:

NIST SP 800-53 Rev 5 maps to PTES with 3% coverage across 27 directly mapped controls. Analysis of 1,014 NIST SP 800-53 Rev 5 controls identifies 987 compliance gaps, primarily concentrated in SC - System and Communications Protection.

Source: TheArtOfService Knowledge Graph | 1,014 controls analysed | 1,016 frameworks | 316K+ cross-framework mappings

Control Mappings

Showing 20 of 33 control mappings across 12 domains. Sign up to explore all 316K+ mappings across 1,016 frameworks.

AC - Access Control(4 mappings)

NIST800-AC-2AC-2 Account Management
→PTESPHASE-2Intelligence Gathering (OSINT)
NIST800-AC-20AC-20 Use of External Systems
→PTESPHASE-2Intelligence Gathering (OSINT)
NIST800-AC-6AC-6 Least Privilege
→PTESPHASE-2Intelligence Gathering (OSINT)
NIST800-AC-7AC-7 Unsuccessful Logon Attempts
→PTESPHASE-2Intelligence Gathering (OSINT)

AT - Awareness and Training(1 mappings)

NIST800-AT-3AT-3 Role-based Training
→PTESPHASE-2Intelligence Gathering (OSINT)

AU - Audit and Accountability(3 mappings)

NIST800-AU-12AU-12 Audit Record Generation
→PTESPHASE-3Threat Modeling
NIST800-AU-2AU-2 Event Logging
→PTESPHASE-3Threat Modeling
NIST800-AU-3AU-3 Content of Audit Records
→PTESPHASE-3Threat Modeling

CA - Assessment, Authorization, and Monitoring(6 mappings)

NIST800-CA-5CA-5 Plan of Action and Milestones
→ptes::PTES-5.1Require an executive summary that ties findings to business risk
NIST800-CA-8CA-8 Penetration Testing3 targets
→PTESPHASE-4Vulnerability Analysis
→ptes::PTES-1.1Define and record the scope in writing before testing
→ptes::PTES-3.4Ensure exploitation and confirmation stay authorised, planned and least-disruptive
NIST800-CA-8(2)CA-8(2) Penetration Testing | Red Team Exercises2 targets
→ptes::PTES-1.4Agree the rules of engagement: how, when and where testing occurs
→ptes::PTES-3.5Benchmark detection and response only as agreed, and record what was detected

CP - Contingency Planning(2 mappings)

NIST800-CP-10CP-10 System Recovery and Reconstitution
→PTESPHASE-3Threat Modeling
NIST800-CP-9CP-9 System Backup
→PTESPHASE-3Threat Modeling

IA - Identification and Authentication(4 mappings)

NIST800-IA-4IA-4 Identifier Management
→PTESPHASE-2Intelligence Gathering (OSINT)
NIST800-IA-7IA-7 Cryptographic Module Authentication2 targets
→PTESPHASE-2Intelligence Gathering (OSINT)
→PTESPHASE-3Threat Modeling
NIST800-IA-8IA-8 Identification and Authentication (Non-organizational Users)
→PTESPHASE-2Intelligence Gathering (OSINT)

+13 more mappings

Plus AI-powered gap analysis, compliance advisory, PDF exports, and cross-mapping for all 1,016 frameworks.

Create Free Account →

Free forever, no credit card required

Coverage crosswalk

A NIST SP 800-53 Rev 5 to PTES crosswalk, built to order

The table above lists candidate mappings. A crosswalk answers the narrower question you are probably here for: which PTES controls your existing NIST SP 800-53 Rev 5 work already satisfies, which are real gaps, and the reasoning behind every claim so you can check it. One pair, $299, one time.

NIST SP 800-53 Rev 5 into PTES
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

PTES into NIST SP 800-53 Rev 5
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

NIST SP 800-53 Rev 5 to PTES (built to order)
$299
per framework pair, one time
  • Every evidenced control, with the reasoning behind it
  • Every gap, with what it requires
  • Its level of review stated plainly, not a bare number

Why this page shows two different percentages. The 3% in the header counts how many NIST SP 800-53 Rev 5 controls carry at least one candidate mapping in the graph, before any review. The crosswalk percentage counts something stricter: how many PTES controls are actually evidenced, after a pass that argued against each mapping and kept only what survived. They answer different questions and they are not meant to agree.

A crosswalk narrows the work. It does not replace an audit, and your assessor may take a different view on individual controls. Mappings between frameworks are judgements, not text printed in either standard, which is why every claim in the report shows its reasoning. Questions go to support@theartofservice.com.

Stop Paying Consultants to Read Spreadsheets

Cross-framework mappings across 1,016 frameworks, at a fraction of consulting costs.

$0/forever

Free

  • ✓ 1,016 framework browser
  • ✓ Cross-framework mappings (316K+)
  • ✓ 824 compliance assessments
  • ✓ 3 AI queries & searches per day
Get Started Free
Recommended
$149/month

Professional

  • ✓ Unlimited AI Compliance Advisory
  • ✓ Unlimited full-text search
  • ✓ Framework self-assessment
  • ✓ PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between NIST SP 800-53 Rev 5 and PTES?

NIST SP 800-53 Rev 5 has 1,014 controls across its framework, while PTES covers 47 controls. Direct mapping analysis identifies 27 overlapping controls (3% coverage). The frameworks diverge most significantly in SC - System and Communications Protection, where 135 NIST SP 800-53 Rev 5 controls have no direct PTES equivalent.

How many controls map between NIST SP 800-53 Rev 5 and PTES?

Of 1,014 total NIST SP 800-53 Rev 5 controls, 27 map directly to PTES controls, representing 3% coverage. The remaining 987 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping NIST SP 800-53 Rev 5 to PTES?

987 NIST SP 800-53 Rev 5 controls have no direct equivalent in PTES. The highest concentration of gaps is in SC - System and Communications Protection with 135 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between NIST SP 800-53 Rev 5 and PTES?

The domain with the highest gap count is SC - System and Communications Protection (135 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are AI-assisted interpretations and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.