Transfer switches are operated monthly by electrically moving them from the primary to the alternate position and back. Where several ATSs serve a system, the switch used to start the monthly test is rotated so every switch is proven over time.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.