Generator sets in service run at least monthly for 30 minutes or more, loaded either to keep the exhaust gas temperature the maker recommends or, at operating temperature, to 30 percent or more of the standby nameplate kW of the EPS. The owner sets date and time to suit operations, and any test load used must be replaced automatically by the emergency loads if the primary source fails during the test.