Cross-Framework Mapping

IATF 16949:2016 - Quality Management System for Automotive ProductionvsAWWA Cybersecurity Guidance for the Water Sector (American Water Works Association)

See exactly how IATF 16949:2016 - Quality Management System for Automotive Production controls map to AWWA Cybersecurity Guidance for the Water Sector (American Water Works Association). Pre-computed mappings, identified gaps, and coverage analysis.

4
Controls Mapped
6
Gaps Found
40%
Coverage

According to the TheArtOfService Compliance Knowledge Graph:

IATF 16949:2016 - Quality Management System for Automotive Production maps to AWWA Cybersecurity Guidance for the Water Sector (American Water Works Association) with 40% coverage across 4 directly mapped controls. Analysis of 10 IATF 16949:2016 - Quality Management System for Automotive Production controls identifies 6 compliance gaps — primarily concentrated in IATF 16949 Clause 8 - Nonconforming + PPAP.

Source: TheArtOfService Knowledge Graph | 10 controls analysed | 718 frameworks | 332K+ cross-framework mappings

Control Mappings

Showing 4 of 4 mapped controls across 4 domains. Sign up to explore all 332K+ mappings across 718 frameworks.

IATF 16949 Clause 10 - Improvement(1 mappings)

IATF16949-Clause10-Improvement-Nonconformity-CorrectiveAction-Problem-ErrorProofIATF 16949 Clause 10 - Improvement + Nonconformity + Corrective Action + Problem Solving + Error Proofing + Continual Improvement
AWWA-1.1Security Policy and Governance

IATF 16949 Clause 6 - Planning(1 mappings)

IATF16949-Clause6-Planning-Risk-Contingency-Objectives-ChangeIATF 16949 Clause 6 - Planning + Risks and Opportunities + Contingency Plans + Quality Objectives + Change
AWWA-1.2Risk Assessment

IATF 16949 Clause 8 - Operation (APQP + Design + Production)(1 mappings)

IATF16949-Clause8-Operation-APQP-Design-Production-ControlPlan-SpecialCharsIATF 16949 Clause 8 - Operation Planning + APQP + Design + Special Characteristics + Production + Control Plan + Set-Up Verification
AWWA-1.2Risk Assessment

IATF 16949 Clause 9 - Performance Evaluation(1 mappings)

IATF16949-Clause9-Performance-Monitoring-InternalAudit-ManagementReviewIATF 16949 Clause 9 - Performance Evaluation + Monitoring + Internal Audit + Manufacturing Process Audit + Management Review
AWWA-1.1Security Policy and Governance

Related Comparisons

Other IATF 16949:2016 - Quality Management System for Automotive Production comparisons

Other AWWA Cybersecurity Guidance for the Water Sector (American Water Works Association) comparisons

Stop Paying Consultants to Read Spreadsheets

AI-powered compliance intelligence across 718 frameworks — at a fraction of consulting costs.

$0/forever

Free

  • 718 framework browser
  • Cross-framework mappings (332K+)
  • 824 compliance assessments
  • 3 AI queries & searches per day
Get Started Free
Recommended
$49/month

Professional

  • Unlimited AI Compliance Advisory
  • Unlimited full-text search
  • Framework self-assessment
  • PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between IATF 16949:2016 - Quality Management System for Automotive Production and AWWA Cybersecurity Guidance for the Water Sector (American Water Works Association)?

IATF 16949:2016 - Quality Management System for Automotive Production has 10 controls across its framework, while AWWA Cybersecurity Guidance for the Water Sector (American Water Works Association) covers 37 controls. Direct mapping analysis identifies 4 overlapping controls (40% coverage). The frameworks diverge most significantly in IATF 16949 Clause 8 - Nonconforming + PPAP, where 1 IATF 16949:2016 - Quality Management System for Automotive Production controls have no direct AWWA Cybersecurity Guidance for the Water Sector (American Water Works Association) equivalent.

How many controls map between IATF 16949:2016 - Quality Management System for Automotive Production and AWWA Cybersecurity Guidance for the Water Sector (American Water Works Association)?

Of 10 total IATF 16949:2016 - Quality Management System for Automotive Production controls, 4 map directly to AWWA Cybersecurity Guidance for the Water Sector (American Water Works Association) controls — representing 40% coverage. The remaining 6 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping IATF 16949:2016 - Quality Management System for Automotive Production to AWWA Cybersecurity Guidance for the Water Sector (American Water Works Association)?

6 IATF 16949:2016 - Quality Management System for Automotive Production controls have no direct equivalent in AWWA Cybersecurity Guidance for the Water Sector (American Water Works Association). The highest concentration of gaps is in IATF 16949 Clause 8 - Nonconforming + PPAP with 1 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between IATF 16949:2016 - Quality Management System for Automotive Production and AWWA Cybersecurity Guidance for the Water Sector (American Water Works Association)?

The domain with the highest gap count is IATF 16949 Clause 8 - Nonconforming + PPAP (1 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are AI-assisted interpretations and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.