Cross-Framework Mapping

HKMA SPMvsIEC 62351 - Power Systems Communication Security

See exactly how HKMA SPM controls map to IEC 62351 - Power Systems Communication Security. Pre-computed mappings, identified gaps, and coverage analysis.

4
Controls Mapped
7
Gaps Found
27%
Coverage

Need this as a report you can hand to an assessor? A coverage crosswalk for this pair can be built to order.

According to the TheArtOfService Compliance Knowledge Graph:

HKMA SPM maps to IEC 62351 - Power Systems Communication Security with 27% coverage across 3 directly mapped controls. Analysis of 11 HKMA SPM controls identifies 8 compliance gaps, primarily concentrated in HKMA SPM: International Coordination (BCBS, IOSCO, FSB), 2024-2025 Pipeline (Climate, AI, DORA, ESG).

Source: TheArtOfService Knowledge Graph | 11 controls analysed | 686 frameworks | 310K+ cross-framework mappings

Control Mappings

Showing 4 of 4 mapped controls across 3 domains. Sign up to explore all 310K+ mappings across 686 frameworks.

HKMA SPM: Corporate Governance (CG-1/2/3/5/6), Internal Control (IC-1/5), Auditing (AC-G)(1 mappings)

HKMA-SPM-CG-IC-AC-Governance-Control-AuditHKMA SPM Corporate Governance (CG-1/2/3/5/6), Internal Control (IC-1/5), Auditing (AC-G)
62351-2Glossary of terms

HKMA SPM: Operational Risk (OR-1), Operational Resilience (OR-2), Recovery Planning (RR-1), Outsourcing (SA-2)(2 mappings)

HKMA-SPM-OR-RR-SA-OperationalResilienceHKMA SPM Operational Risk (OR-1), Operational Resilience (OR-2), Recovery Planning (RR-1), Outsourcing (SA-2)2 targets
62351-12Resilience and security recommendations for DER
62351-13Cyber-physical generation and storage resilience

HKMA SPM: Technology Management Modules (TM-G-1 to TM-G-4, TM-E-1 e-Banking) + Coordination with C-RAF(1 mappings)

HKMA-SPM-TM-Technology-TM-G-1-CRAF-CoordHKMA SPM Technology Management Modules (TM-G-1 to TM-G-4, TM-E-1) + Coordination with C-RAF
62351-9Cyber security key management
Coverage crosswalk

A HKMA SPM to IEC 62351 - Power Systems Communication Security crosswalk, built to order

The table above lists candidate mappings. A crosswalk answers the narrower question you are probably here for: which IEC 62351 - Power Systems Communication Security controls your existing HKMA SPM work already satisfies, which are real gaps, and the reasoning behind every claim so you can check it. One pair, $299, one time.

HKMA SPM into IEC 62351 - Power Systems Communication Security
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

IEC 62351 - Power Systems Communication Security into HKMA SPM
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

HKMA SPM to IEC 62351 - Power Systems Communication Security (built to order)
$299
per framework pair, one time
  • Every evidenced control, with the reasoning behind it
  • Every gap, with what it requires
  • Its level of review stated plainly, not a bare number

Why this page shows two different percentages. The 27% in the header counts how many HKMA SPM controls carry at least one candidate mapping in the graph, before any review. The crosswalk percentage counts something stricter: how many IEC 62351 - Power Systems Communication Security controls are actually evidenced, after a pass that argued against each mapping and kept only what survived. They answer different questions and they are not meant to agree.

A crosswalk narrows the work. It does not replace an audit, and your assessor may take a different view on individual controls. Mappings between frameworks are judgements, not text printed in either standard, which is why every claim in the report shows its reasoning. Questions go to support@theartofservice.com.

Related Comparisons

Stop Paying Consultants to Read Spreadsheets

AI-powered compliance intelligence across 686 frameworks, at a fraction of consulting costs.

$0/forever

Free

  • 686 framework browser
  • Cross-framework mappings (310K+)
  • 824 compliance assessments
  • 3 AI queries & searches per day
Get Started Free
Recommended
$149/month

Professional

  • Unlimited AI Compliance Advisory
  • Unlimited full-text search
  • Framework self-assessment
  • PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between HKMA SPM and IEC 62351 - Power Systems Communication Security?

HKMA SPM has 11 controls across its framework, while IEC 62351 - Power Systems Communication Security covers 33 controls. Direct mapping analysis identifies 3 overlapping controls (27% coverage). The frameworks diverge most significantly in HKMA SPM: International Coordination (BCBS, IOSCO, FSB), 2024-2025 Pipeline (Climate, AI, DORA, ESG), where 4 HKMA SPM controls have no direct IEC 62351 - Power Systems Communication Security equivalent.

How many controls map between HKMA SPM and IEC 62351 - Power Systems Communication Security?

Of 11 total HKMA SPM controls, 3 map directly to IEC 62351 - Power Systems Communication Security controls, representing 27% coverage. The remaining 8 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping HKMA SPM to IEC 62351 - Power Systems Communication Security?

8 HKMA SPM controls have no direct equivalent in IEC 62351 - Power Systems Communication Security. The highest concentration of gaps is in HKMA SPM: International Coordination (BCBS, IOSCO, FSB), 2024-2025 Pipeline (Climate, AI, DORA, ESG) with 4 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between HKMA SPM and IEC 62351 - Power Systems Communication Security?

The domain with the highest gap count is HKMA SPM: International Coordination (BCBS, IOSCO, FSB), 2024-2025 Pipeline (Climate, AI, DORA, ESG) (4 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are AI-assisted interpretations and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.