Cross-Framework Mapping

C5 (Germany)vsNIST SP 800-66 Rev 2

See exactly how C5 (Germany) controls map to NIST SP 800-66 Rev 2. Pre-computed mappings, identified gaps, and coverage analysis.

113
Controls Mapped
8
Gaps Found
59%
Coverage

Need this as a report you can hand to an assessor? A coverage crosswalk for this pair can be built to order.

According to the TheArtOfService Compliance Knowledge Graph:

C5 (Germany) maps to NIST SP 800-66 Rev 2 with 59% coverage across 71 directly mapped controls. Analysis of 121 C5 (Germany) controls identifies 50 compliance gaps, primarily concentrated in C5: Procurement, Development and Modification of Information Systems.

Source: TheArtOfService Knowledge Graph | 121 controls analysed | 686 frameworks | 309K+ cross-framework mappings

Control Mappings

Showing 20 of 113 mapped controls across 16 domains. Sign up to explore all 309K+ mappings across 686 frameworks.

C5: Asset Management(11 mappings)

C5-AM-01Asset Inventory2 targets
164.308(a)(7)(ii)(E)Applications and Data Criticality Analysis (Addressable)
164.310(d)(2)(iii)Accountability (Addressable)
C5-AM-02Acceptable Use and Safe Handling of Assets Policy2 targets
164.310(b)Workstation Use (Standard)
164.310(d)(1)Device and Media Controls (Standard)
C5-AM-03Commissioning of Hardware
164.310(a)(2)(iv)Maintenance Records (Addressable)
C5-AM-04Decommissioning of Hardware2 targets
164.310(d)(2)(i)Disposal (Required)
164.310(d)(2)(ii)Media Re-use (Required)
C5-AM-05Commitment to Permissible Use, Safe Handling and Return of Assets3 targets
164.308(a)(1)(ii)(C)Sanction Policy (Required)
164.308(a)(3)(ii)(C)Termination Procedures (Addressable)
164.310(d)(1)Device and Media Controls (Standard)
C5-AM-06Asset Classification and Labelling
164.308(a)(7)(ii)(E)Applications and Data Criticality Analysis (Addressable)

C5: Business Continuity Management(6 mappings)

C5-BCM-01Top management responsibility
164.308(a)(2)Assigned Security Responsibility (Standard)
C5-BCM-02Business impact analysis policies and instructions
164.308(a)(7)(ii)(E)Applications and Data Criticality Analysis (Addressable)
C5-BCM-03Planning business continuity3 targets
164.308(a)(7)(i)Contingency Plan (Standard)
164.308(a)(7)(ii)(B)Disaster Recovery Plan (Required)
164.308(a)(7)(ii)(C)Emergency Mode Operation Plan (Required)
C5-BCM-04Verification, updating and testing of the business continuity
164.308(a)(7)(ii)(D)Testing and Revision Procedures (Addressable)

C5: Compliance(3 mappings)

C5-COM-02Policy for planning and conducting audits
164.308(a)(8)Evaluation (Standard)
C5-COM-03Internal audits of the information security management system
164.308(a)(8)Evaluation (Standard)
C5-COM-04Information on information security performance and management assessment of the ISMS
164.308(a)(1)(ii)(D)Information System Activity Review (Required)

+93 more mappings

Plus AI-powered gap analysis, compliance advisory, PDF exports, and cross-mapping for all 686 frameworks.

Create Free Account →

Free forever, no credit card required

Coverage crosswalk

A C5 (Germany) to NIST SP 800-66 Rev 2 crosswalk, built to order

The table above lists candidate mappings. A crosswalk answers the narrower question you are probably here for: which NIST SP 800-66 Rev 2 controls your existing C5 (Germany) work already satisfies, which are real gaps, and the reasoning behind every claim so you can check it. One pair, $299, one time.

C5 (Germany) into NIST SP 800-66 Rev 2
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

NIST SP 800-66 Rev 2 into C5 (Germany)
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

C5 (Germany) to NIST SP 800-66 Rev 2 (built to order)
$299
per framework pair, one time
  • Every evidenced control, with the reasoning behind it
  • Every gap, with what it requires
  • Its level of review stated plainly, not a bare number

Why this page shows two different percentages. The 59% in the header counts how many C5 (Germany) controls carry at least one candidate mapping in the graph, before any review. The crosswalk percentage counts something stricter: how many NIST SP 800-66 Rev 2 controls are actually evidenced, after a pass that argued against each mapping and kept only what survived. They answer different questions and they are not meant to agree.

A crosswalk narrows the work. It does not replace an audit, and your assessor may take a different view on individual controls. Mappings between frameworks are judgements, not text printed in either standard, which is why every claim in the report shows its reasoning. Questions go to support@theartofservice.com.

Stop Paying Consultants to Read Spreadsheets

AI-powered compliance intelligence across 686 frameworks, at a fraction of consulting costs.

$0/forever

Free

  • 686 framework browser
  • Cross-framework mappings (309K+)
  • 824 compliance assessments
  • 3 AI queries & searches per day
Get Started Free
Recommended
$149/month

Professional

  • Unlimited AI Compliance Advisory
  • Unlimited full-text search
  • Framework self-assessment
  • PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between C5 (Germany) and NIST SP 800-66 Rev 2?

C5 (Germany) has 121 controls across its framework, while NIST SP 800-66 Rev 2 covers 65 controls. Direct mapping analysis identifies 71 overlapping controls (59% coverage). The frameworks diverge most significantly in C5: Procurement, Development and Modification of Information Systems, where 9 C5 (Germany) controls have no direct NIST SP 800-66 Rev 2 equivalent.

How many controls map between C5 (Germany) and NIST SP 800-66 Rev 2?

Of 121 total C5 (Germany) controls, 71 map directly to NIST SP 800-66 Rev 2 controls, representing 59% coverage. The remaining 50 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping C5 (Germany) to NIST SP 800-66 Rev 2?

50 C5 (Germany) controls have no direct equivalent in NIST SP 800-66 Rev 2. The highest concentration of gaps is in C5: Procurement, Development and Modification of Information Systems with 9 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between C5 (Germany) and NIST SP 800-66 Rev 2?

The domain with the highest gap count is C5: Procurement, Development and Modification of Information Systems (9 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are AI-assisted interpretations and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.