A person involved in preparing a plant design is barred from knowingly serving as the design verifier for that design. The prohibition protects the independence of the verification statement. Maximum penalty: 100 penalty units for an individual and 500 for a body corporate.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.