Fixed systems are planned, installed and serviced to the maker's installation manual and specifications or to the adopted standards, unless the work follows a standard the local political subdivision has adopted. On completing a pre-engineered system a licensee authorised to certify such systems places an installation label certifying compliance; on completing any other fixed system a Type A or PL licensee places the label certifying compliance with the manuals, with plans by a Type PL licensee or professional engineer, or with the adopted standards. The licensee whose signature is on the label must attend the final test before certification, and a service tag certifying the licensee's work is attached to the system when service is complete.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.