Level 1 EPSS circuit breakers, including main and feeder breakers from the EPS up to the transfer switches, are exercised annually with the EPS off; breakers rated over 600 V get a six-monthly exercise and, every second year, a simulated overload test.
This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.