A test may be started by the ATS test switch or by opening a normal-side breaker, which is optional; load tests include complete cold starts; and time delays are set to at least 1 second on start (0.5 second for gas turbines), no minimum on transfer, at least 5 minutes on retransfer to normal and at least 5 minutes cooldown before shutdown.
This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.