NFPA 110-2025 Standard for Emergency and Standby Power Systems
Chapter 8: Routine maintenance and operational testing – NFPA 110-2025 Standard for Emergency and Standby Power Systems

NFPA 110-2025 Standard for Emergency and Standby Power Systems 8.4.3-8.4.5: 8.4.3 to 8.4.5 Test initiation, cold starts and time delay settings

A test may be started by the ATS test switch or by opening a normal-side breaker, which is optional; load tests include complete cold starts; and time delays are set to at least 1 second on start (0.5 second for gas turbines), no minimum on transfer, at least 5 minutes on retransfer to normal and at least 5 minutes cooldown before shutdown.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 17.85-17.86 Multi-set test loading above 70% and cooling run-on after tests
  • 9.54 Minimum generator run time of 20 minutes after any start

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.