For SQG and LQG entities a trained professional must make the 262.11 determination for unwanted material either in the laboratory before removal (262.210), within 4 calendar days of arrival at an on-site central accumulation area (262.211), or within 4 calendar days of arrival at an on-site interim status or permitted TSDF (262.212). For VSQG entities the determination must be made in the laboratory before removal.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.