A PCBU carrying out a lead process gives information about the health risks and toxic effects of lead exposure, and, for lead risk work, the need for and details of health monitoring, to a person likely to be engaged before engagement, to a worker before starting the lead process, and, where work is identified as lead risk work after it starts, as soon as practicable and before health monitoring.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.