Cross-Framework Mapping

NIST SP 800-53 Rev 5 MODERATEvsC5 (Germany)

See exactly how NIST SP 800-53 Rev 5 MODERATE controls map to C5 (Germany). Pre-computed mappings, identified gaps, and coverage analysis.

307
Controls Mapped
0
Gaps Found
64%
Coverage

Need this as a report you can hand to an assessor? A coverage crosswalk for this pair can be built to order.

According to the TheArtOfService Compliance Knowledge Graph:

NIST SP 800-53 Rev 5 MODERATE maps to C5 (Germany) with 64% coverage across 175 directly mapped controls. Analysis of 275 NIST SP 800-53 Rev 5 MODERATE controls identifies 100 compliance gaps, primarily concentrated in PM Program Management.

Source: TheArtOfService Knowledge Graph | 275 controls analysed | 686 frameworks | 309K+ cross-framework mappings

Control Mappings

Showing 20 of 307 mapped controls across 18 domains. Sign up to explore all 309K+ mappings across 686 frameworks.

AC Access Control(20 mappings)

AC-1Policy and Procedures2 targets
C5-IDM-01Policy for user accounts and access rights
C5-SP-01Documentation, communication and provision of policies and instructions
AC-12Session Termination
C5-PSS-06Session Management
AC-17Remote Access2 targets
C5-COS-04Cross-network access
C5-COS-05Networks for administration
AC-17(1)Monitoring and Control
C5-COS-03Monitoring of connections in the Cloud Service Provider's network
AC-17(2)Protection of Confidentiality and Integrity Using Encryption
C5-CRY-02Encryption of data for transmission (transport encryption)
AC-17(3)Managed Access Control Points
C5-COS-05Networks for administration
AC-17(4)Privileged Commands and Access
C5-IDM-06Privileged access rights
AC-19Access Control for Mobile Devices
C5-AM-02Acceptable Use and Safe Handling of Assets Policy
AC-2Account Management5 targets
C5-IDM-01Policy for user accounts and access rights
C5-IDM-02Granting and change of user accounts and access rights
C5-IDM-03Locking and withdrawal of user accounts in the event of inactivity or multiple failed logins
C5-IDM-04Withdraw or adjust access rights as the task area changes
C5-IDM-05Regular review of access rights
AC-2(13)Disable Accounts for High-Risk Individuals
C5-IDM-04Withdraw or adjust access rights as the task area changes
AC-2(3)Disable Accounts
C5-IDM-03Locking and withdrawal of user accounts in the event of inactivity or multiple failed logins
AC-2(5)Inactivity Logout
C5-PSS-06Session Management
AC-20Use of External Systems
C5-SSO-01Policies and instructions for controlling and monitoring third parties
AC-3Access Enforcement
C5-IDM-02Granting and change of user accounts and access rights

+287 more mappings

Plus AI-powered gap analysis, compliance advisory, PDF exports, and cross-mapping for all 686 frameworks.

Create Free Account →

Free forever, no credit card required

Coverage crosswalk

A NIST SP 800-53 Rev 5 MODERATE to C5 (Germany) crosswalk, built to order

The table above lists candidate mappings. A crosswalk answers the narrower question you are probably here for: which C5 (Germany) controls your existing NIST SP 800-53 Rev 5 MODERATE work already satisfies, which are real gaps, and the reasoning behind every claim so you can check it. One pair, $299, one time.

NIST SP 800-53 Rev 5 MODERATE into C5 (Germany)
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

C5 (Germany) into NIST SP 800-53 Rev 5 MODERATE
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

NIST SP 800-53 Rev 5 MODERATE to C5 (Germany) (built to order)
$299
per framework pair, one time
  • Every evidenced control, with the reasoning behind it
  • Every gap, with what it requires
  • Its level of review stated plainly, not a bare number

Why this page shows two different percentages. The 64% in the header counts how many NIST SP 800-53 Rev 5 MODERATE controls carry at least one candidate mapping in the graph, before any review. The crosswalk percentage counts something stricter: how many C5 (Germany) controls are actually evidenced, after a pass that argued against each mapping and kept only what survived. They answer different questions and they are not meant to agree.

A crosswalk narrows the work. It does not replace an audit, and your assessor may take a different view on individual controls. Mappings between frameworks are judgements, not text printed in either standard, which is why every claim in the report shows its reasoning. Questions go to support@theartofservice.com.

Stop Paying Consultants to Read Spreadsheets

AI-powered compliance intelligence across 686 frameworks, at a fraction of consulting costs.

$0/forever

Free

  • 686 framework browser
  • Cross-framework mappings (309K+)
  • 824 compliance assessments
  • 3 AI queries & searches per day
Get Started Free
Recommended
$149/month

Professional

  • Unlimited AI Compliance Advisory
  • Unlimited full-text search
  • Framework self-assessment
  • PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between NIST SP 800-53 Rev 5 MODERATE and C5 (Germany)?

NIST SP 800-53 Rev 5 MODERATE has 275 controls across its framework, while C5 (Germany) covers 121 controls. Direct mapping analysis identifies 175 overlapping controls (64% coverage). The frameworks diverge most significantly in PM Program Management, where 32 NIST SP 800-53 Rev 5 MODERATE controls have no direct C5 (Germany) equivalent.

How many controls map between NIST SP 800-53 Rev 5 MODERATE and C5 (Germany)?

Of 275 total NIST SP 800-53 Rev 5 MODERATE controls, 175 map directly to C5 (Germany) controls, representing 64% coverage. The remaining 100 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping NIST SP 800-53 Rev 5 MODERATE to C5 (Germany)?

100 NIST SP 800-53 Rev 5 MODERATE controls have no direct equivalent in C5 (Germany). The highest concentration of gaps is in PM Program Management with 32 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between NIST SP 800-53 Rev 5 MODERATE and C5 (Germany)?

The domain with the highest gap count is PM Program Management (32 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are AI-assisted interpretations and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.