Cross-Framework Mapping

ISO 9001:2015vsISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

See exactly how ISO 9001:2015 controls map to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM). Pre-computed mappings, identified gaps, and coverage analysis.

18
Controls Mapped
86
Gaps Found
17%
Coverage

Need this as a report you can hand to an assessor? A coverage crosswalk for this pair can be built to order.

According to the TheArtOfService Compliance Knowledge Graph:

ISO 9001:2015 maps to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) with 17% coverage across 18 directly mapped controls. Analysis of 104 ISO 9001:2015 controls identifies 86 compliance gaps, primarily concentrated in Superseded batch representation – ISO 9001:2015.

Source: TheArtOfService Knowledge Graph | 104 controls analysed | 1,121 frameworks | 315K+ cross-framework mappings

Control Mappings

Showing 20 of 70 control mappings across 5 domains. Sign up to explore all 315K+ mappings across 1,121 frameworks.

Context of the organization – ISO 9001:2015(2 mappings)

iso-9001-2015::4.4Quality management system and its processes2 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.1.55.1.5 Establish the project's information production methods and procedures
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::3:5.1.75.1.7 Establish the asset information production methods and procedures

Leadership – ISO 9001:2015(5 mappings)

iso-9001-2015::5.3Organizational roles, responsibilities and authorities5 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::1:7.17.1 Principles of information management functions
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::1:7.37.3 Project information management functions
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::1:7.47.4 Task information management functions
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.1.15.1.1 Appoint individuals to undertake the information management function
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.3.15.3.1 Nominate individuals to undertake the information management function

Planning – ISO 9001:2015(2 mappings)

iso-9001-2015::6.1Actions to address risks and opportunities2 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.3.65.3.6 Establish the delivery team's risk register
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::3:5.3.65.3.6 Establish the delivery team's risk register

Support – ISO 9001:2015(6 mappings)

iso-9001-2015::7.1.3Infrastructure2 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.5.25.5.2 Mobilize information technology
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::3:5.5.25.5.2 Mobilize information technology
iso-9001-2015::7.1.6Organizational knowledge
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.8.25.8.2 Capture lessons learned for future projects
iso-9001-2015::7.2Competence2 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.5.15.5.1 Mobilize resources
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::3:5.5.15.5.1 Mobilize resources
iso-9001-2015::7.5.3Control of documented information
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::1:11.111.1 Principles of managing collaborative production

Operation – ISO 9001:2015(5 mappings)

iso-9001-2015::8.1Operational planning and control3 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.1.35.1.3 Establish the project's information delivery milestones
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.3.55.3.5 Establish the delivery team's mobilization plan
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::3:5.3.55.3.5 Establish the delivery team's mobilization plan
iso-9001-2015::8.2.3Review of the requirements for products and services2 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.3.25.3.2 Establish the delivery team's pre-appointment BIM execution plan
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.3.35.3.3 Assess task team capability and capacity

+50 more mappings

Plus AI-powered gap analysis, compliance advisory, PDF exports, and cross-mapping for all 1,121 frameworks.

Create Free Account →

Free forever, no credit card required

Coverage crosswalk

A ISO 9001:2015 to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) crosswalk, built to order

The table above lists candidate mappings. A crosswalk answers the narrower question you are probably here for: which ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) controls your existing ISO 9001:2015 work already satisfies, which are real gaps, and the reasoning behind every claim so you can check it. One pair, $299, one time.

ISO 9001:2015 into ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) into ISO 9001:2015
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

ISO 9001:2015 to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) (built to order)
$299
per framework pair, one time
  • Every evidenced control, with the reasoning behind it
  • Every gap, with what it requires
  • Its level of review stated plainly, not a bare number

Why this page shows two different percentages. The 17% in the header counts how many ISO 9001:2015 controls carry at least one candidate mapping in the graph, before any review. The crosswalk percentage counts something stricter: how many ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) controls are actually evidenced, after a pass that argued against each mapping and kept only what survived. They answer different questions and they are not meant to agree.

A crosswalk narrows the work. It does not replace an audit, and your assessor may take a different view on individual controls. Mappings between frameworks are judgements, not text printed in either standard, which is why every claim in the report shows its reasoning. Questions go to support@theartofservice.com.

Related Comparisons

Other ISO 9001:2015 comparisons

Other ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) comparisons

Stop Paying Consultants to Read Spreadsheets

Cross-framework mappings across 1,121 frameworks, at a fraction of consulting costs.

$0/forever

Free

  • ✓ 1,121 framework browser
  • ✓ Cross-framework mappings (315K+)
  • ✓ 824 compliance assessments
  • ✓ 3 AI queries & searches per day
Get Started Free
Recommended
$149/month

Professional

  • ✓ Unlimited AI Compliance Advisory
  • ✓ Unlimited full-text search
  • ✓ Framework self-assessment
  • ✓ PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between ISO 9001:2015 and ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)?

ISO 9001:2015 has 104 controls across its framework, while ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) covers 242 controls. Direct mapping analysis identifies 18 overlapping controls (17% coverage). The frameworks diverge most significantly in Superseded batch representation – ISO 9001:2015, where 48 ISO 9001:2015 controls have no direct ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) equivalent.

How many controls map between ISO 9001:2015 and ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)?

Of 104 total ISO 9001:2015 controls, 18 map directly to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) controls, representing 17% coverage. The remaining 86 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping ISO 9001:2015 to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)?

86 ISO 9001:2015 controls have no direct equivalent in ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM). The highest concentration of gaps is in Superseded batch representation – ISO 9001:2015 with 48 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between ISO 9001:2015 and ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)?

The domain with the highest gap count is Superseded batch representation – ISO 9001:2015 (48 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are judged interpretations, grounded in the source text of both frameworks, and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.