Cross-Framework Mapping

ISO 15489-1:2016vsISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

See exactly how ISO 15489-1:2016 controls map to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM). Pre-computed mappings, identified gaps, and coverage analysis.

10
Controls Mapped
26
Gaps Found
28%
Coverage

Need this as a report you can hand to an assessor? A coverage crosswalk for this pair can be built to order.

According to the TheArtOfService Compliance Knowledge Graph:

ISO 15489-1:2016 maps to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) with 28% coverage across 10 directly mapped controls. Analysis of 36 ISO 15489-1:2016 controls identifies 26 compliance gaps, primarily concentrated in Clause 5: Records and records systems – ISO 15489-1:2016.

Source: TheArtOfService Knowledge Graph | 36 controls analysed | 1,121 frameworks | 315K+ cross-framework mappings

Control Mappings

Showing 20 of 20 control mappings across 3 domains. Sign up to explore all 315K+ mappings across 1,121 frameworks.

Clause 5: Records and records systems – ISO 15489-1:2016(7 mappings)

iso-15489-1-2016::5.15.1 Records as evidence and information assets2 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::1:12.712.7 The archive state
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::1:5.75.7 Project information model (PIM)
iso-15489-1-2016::5.2.2.25.2.2.2 Reliability2 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::1:12.612.6 The published state
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::4:5.35.3 Published state
iso-15489-1-2016::5.3.15.3.1 Records systems: design objectives3 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::1:12.112.1 Principles of the CDE solution and workflow
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.1.75.1.7 Establish the project's common data environment
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::3:5.1.95.1.9 Establish the common data environment

Clause 8: Records controls – ISO 15489-1:2016(6 mappings)

iso-15489-1-2016::8.18.1 Records controls: general4 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::1:11.311.3 Information quality
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.1.45.1.4 Establish the project's information standard
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::3:5.1.65.1.6 Establish the asset information standard
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::6:6.26.2 Additional requirements for the information standard and production methods and procedures
iso-15489-1-2016::8.28.2 Metadata schemas for records2 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::4:7.17.1 Common data environment (CDE)
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::6:4.34.3 Schema

Clause 9: Processes for creating, capturing and managing records – ISO 15489-1:2016(7 mappings)

iso-15489-1-2016::9.39.3 Capturing records
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::6:4.44.4 Health and safety risk, risk treatment and incident identifiers
iso-15489-1-2016::9.59.5 Access control2 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::1:12.212.2 The work in progress state
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::1:12.412.4 The shared state
iso-15489-1-2016::9.79.7 Use and reuse2 targets
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.1.65.1.6 Establish the project's reference information and shared resources
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::3:5.1.85.1.8 Establish the reference information and shared resources
iso-15489-1-2016::9.89.8 Migrating and converting records
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::4:7.47.4 Communication
iso-15489-1-2016::9.99.9 Disposition
→iso-19650-organisation-and-digitisation-of-information-about-buildings-and-civil-engineering-works-bim::2:5.8.15.8.1 Archive the project information model
Coverage crosswalk

A ISO 15489-1:2016 to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) crosswalk, built to order

The table above lists candidate mappings. A crosswalk answers the narrower question you are probably here for: which ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) controls your existing ISO 15489-1:2016 work already satisfies, which are real gaps, and the reasoning behind every claim so you can check it. One pair, $299, one time.

ISO 15489-1:2016 into ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) into ISO 15489-1:2016
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

ISO 15489-1:2016 to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) (built to order)
$299
per framework pair, one time
  • Every evidenced control, with the reasoning behind it
  • Every gap, with what it requires
  • Its level of review stated plainly, not a bare number

Why this page shows two different percentages. The 28% in the header counts how many ISO 15489-1:2016 controls carry at least one candidate mapping in the graph, before any review. The crosswalk percentage counts something stricter: how many ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) controls are actually evidenced, after a pass that argued against each mapping and kept only what survived. They answer different questions and they are not meant to agree.

A crosswalk narrows the work. It does not replace an audit, and your assessor may take a different view on individual controls. Mappings between frameworks are judgements, not text printed in either standard, which is why every claim in the report shows its reasoning. Questions go to support@theartofservice.com.

Stop Paying Consultants to Read Spreadsheets

Cross-framework mappings across 1,121 frameworks, at a fraction of consulting costs.

$0/forever

Free

  • ✓ 1,121 framework browser
  • ✓ Cross-framework mappings (315K+)
  • ✓ 824 compliance assessments
  • ✓ 3 AI queries & searches per day
Get Started Free
Recommended
$149/month

Professional

  • ✓ Unlimited AI Compliance Advisory
  • ✓ Unlimited full-text search
  • ✓ Framework self-assessment
  • ✓ PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between ISO 15489-1:2016 and ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)?

ISO 15489-1:2016 has 36 controls across its framework, while ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) covers 242 controls. Direct mapping analysis identifies 10 overlapping controls (28% coverage). The frameworks diverge most significantly in Clause 5: Records and records systems – ISO 15489-1:2016, where 9 ISO 15489-1:2016 controls have no direct ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) equivalent.

How many controls map between ISO 15489-1:2016 and ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)?

Of 36 total ISO 15489-1:2016 controls, 10 map directly to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) controls, representing 28% coverage. The remaining 26 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping ISO 15489-1:2016 to ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)?

26 ISO 15489-1:2016 controls have no direct equivalent in ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM). The highest concentration of gaps is in Clause 5: Records and records systems – ISO 15489-1:2016 with 9 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between ISO 15489-1:2016 and ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)?

The domain with the highest gap count is Clause 5: Records and records systems – ISO 15489-1:2016 (9 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are judged interpretations, grounded in the source text of both frameworks, and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.