Cross-Framework Mapping

IEC 62351 - Power Systems Communication SecurityvsPAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments

See exactly how IEC 62351 - Power Systems Communication Security controls map to PAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments. Pre-computed mappings, identified gaps, and coverage analysis.

3
Controls Mapped
31
Gaps Found
9%
Coverage

According to the TheArtOfService Compliance Knowledge Graph:

IEC 62351 - Power Systems Communication Security maps to PAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments with 9% coverage across 3 directly mapped controls. Analysis of 34 IEC 62351 - Power Systems Communication Security controls identifies 31 compliance gaps — primarily concentrated in Parts 12-14: DER, Resilience, and Monitoring.

Source: TheArtOfService Knowledge Graph | 34 controls analysed | 718 frameworks | 332K+ cross-framework mappings

Control Mappings

Showing 3 of 3 mapped controls across 2 domains. Sign up to explore all 332K+ mappings across 718 frameworks.

Parts 12-14: DER, Resilience, and Monitoring(1 mappings)

62351-14Cyber security event logging
PASONE-4Technical Security: CDE Configuration, BIM Tools, Encryption, Aggregation, Mobile Working

Parts 7-9: Network Management, Access Control, and Key Management(2 mappings)

62351-8Role-based access control (RBAC)
PASONE-4Technical Security: CDE Configuration, BIM Tools, Encryption, Aggregation, Mobile Working
62351-9Cyber security key management
PASONE-4Technical Security: CDE Configuration, BIM Tools, Encryption, Aggregation, Mobile Working

Related Comparisons

Other IEC 62351 - Power Systems Communication Security comparisons

Other PAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments comparisons

Stop Paying Consultants to Read Spreadsheets

AI-powered compliance intelligence across 718 frameworks — at a fraction of consulting costs.

$0/forever

Free

  • 718 framework browser
  • Cross-framework mappings (332K+)
  • 824 compliance assessments
  • 3 AI queries & searches per day
Get Started Free
Recommended
$49/month

Professional

  • Unlimited AI Compliance Advisory
  • Unlimited full-text search
  • Framework self-assessment
  • PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between IEC 62351 - Power Systems Communication Security and PAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments?

IEC 62351 - Power Systems Communication Security has 34 controls across its framework, while PAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments covers 6 controls. Direct mapping analysis identifies 3 overlapping controls (9% coverage). The frameworks diverge most significantly in Parts 12-14: DER, Resilience, and Monitoring, where 2 IEC 62351 - Power Systems Communication Security controls have no direct PAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments equivalent.

How many controls map between IEC 62351 - Power Systems Communication Security and PAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments?

Of 34 total IEC 62351 - Power Systems Communication Security controls, 3 map directly to PAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments controls — representing 9% coverage. The remaining 31 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping IEC 62351 - Power Systems Communication Security to PAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments?

31 IEC 62351 - Power Systems Communication Security controls have no direct equivalent in PAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments. The highest concentration of gaps is in Parts 12-14: DER, Resilience, and Monitoring with 2 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between IEC 62351 - Power Systems Communication Security and PAS 1192-5:2015 - Security-Minded Approach to BIM and Digital Built Environments?

The domain with the highest gap count is Parts 12-14: DER, Resilience, and Monitoring (2 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are AI-assisted interpretations and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.