Cross-Framework Mapping

FedRAMP Rev 5vsAPRA CPS 234

See exactly how FedRAMP Rev 5 controls map to APRA CPS 234. Pre-computed mappings, identified gaps, and coverage analysis.

23
Controls Mapped
0
Gaps Found
42%
Coverage

According to the TheArtOfService Compliance Knowledge Graph:

FedRAMP Rev 5 maps to APRA CPS 234 with 42% coverage across 5 directly mapped controls. Analysis of 12 FedRAMP Rev 5 controls identifies 7 compliance gaps — primarily concentrated in FedRAMP: OMB M-24-15 Modernization, FedRAMP 2.0 and Coordination with StateRAMP / GovRAMP.

Source: TheArtOfService Knowledge Graph | 12 controls analysed | 704 frameworks | 359K+ cross-framework mappings

Control Mappings

Showing 20 of 23 mapped controls across 3 domains. Sign up to explore all 359K+ mappings across 704 frameworks.

FedRAMP: Baseline Selection (Low, Moderate, High, LI-SaaS) and Control Overlay Parameters(1 mappings)

FedRAMP-BaselinesFedRAMP Baseline Selection (Low, Moderate, High, LI-SaaS) and Control Overlay Parameters
CPS234-09Encryption and key management

FedRAMP: Authorization Boundary, SSP, SAR, POA&M and System Documentation(14 mappings)

FedRAMP-BoundaryAuthorization Boundary, SSP, SAR, POA&M documentation9 targets
CPS234-05Roles and responsibilities definition
CPS234-10Secure configuration standards
CPS234-12Disaster recovery procedures
CPS234-21Implementation of Controls
CPS234-21Implementation of Controls
CPS234-23Frequency and Methodology of Testing
CPS234-23Frequency and Methodology of Testing
CPS234-25Internal Audit of Information Security
CPS234-25Internal Audit of Information Security
FedRAMP-SupplyChain-SBOMFedRAMP supply chain risk management + SBOM (per EO 14028 + NIST 800-218 SSDF)5 targets
CPS234-16Capability of Third Parties
CPS234-16Capability of Third Parties
CPS234-18Ongoing monitoring and assessment
CPS234-20Information Asset Identification and Classification
CPS234-20Information Asset Identification and Classification

FedRAMP: Continuous Monitoring (ConMon) and Significant Change Requests(5 mappings)

FedRAMP-ConMonContinuous Monitoring (ConMon) and Significant Change Requests
CPS234-05Roles and responsibilities definition
FedRAMP-IncidentReportingFedRAMP incident reporting to PMO and US-CERT4 targets
CPS234-12Disaster recovery procedures
CPS234-21Implementation of Controls
CPS234-21Implementation of Controls
CPS234-23Frequency and Methodology of Testing

+3 more mappings

Plus AI-powered gap analysis, compliance advisory, PDF exports, and cross-mapping for all 704 frameworks.

Create Free Account →

Free forever — no credit card required

Stop Paying Consultants to Read Spreadsheets

AI-powered compliance intelligence across 704 frameworks — at a fraction of consulting costs.

$0/forever

Free

  • 704 framework browser
  • Cross-framework mappings (359K+)
  • 824 compliance assessments
  • 3 AI queries & searches per day
Get Started Free
Recommended
$49/month

Professional

  • Unlimited AI Compliance Advisory
  • Unlimited full-text search
  • Framework self-assessment
  • PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between FedRAMP Rev 5 and APRA CPS 234?

FedRAMP Rev 5 has 12 controls across its framework, while APRA CPS 234 covers 35 controls. Direct mapping analysis identifies 5 overlapping controls (42% coverage). The frameworks diverge most significantly in FedRAMP: OMB M-24-15 Modernization, FedRAMP 2.0 and Coordination with StateRAMP / GovRAMP, where 2 FedRAMP Rev 5 controls have no direct APRA CPS 234 equivalent.

How many controls map between FedRAMP Rev 5 and APRA CPS 234?

Of 12 total FedRAMP Rev 5 controls, 5 map directly to APRA CPS 234 controls — representing 42% coverage. The remaining 7 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping FedRAMP Rev 5 to APRA CPS 234?

7 FedRAMP Rev 5 controls have no direct equivalent in APRA CPS 234. The highest concentration of gaps is in FedRAMP: OMB M-24-15 Modernization, FedRAMP 2.0 and Coordination with StateRAMP / GovRAMP with 2 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between FedRAMP Rev 5 and APRA CPS 234?

The domain with the highest gap count is FedRAMP: OMB M-24-15 Modernization, FedRAMP 2.0 and Coordination with StateRAMP / GovRAMP (2 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are AI-assisted interpretations and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.