Cross-Framework Mapping

HKMA SPMvsAPRA CPS 234

See exactly how HKMA SPM controls map to APRA CPS 234. Pre-computed mappings, identified gaps, and coverage analysis.

23
Controls Mapped
0
Gaps Found
27%
Coverage

According to the TheArtOfService Compliance Knowledge Graph:

HKMA SPM maps to APRA CPS 234 with 27% coverage across 3 directly mapped controls. Analysis of 11 HKMA SPM controls identifies 8 compliance gaps — primarily concentrated in HKMA SPM: International Coordination (BCBS, IOSCO, FSB), 2024-2025 Pipeline (Climate, AI, DORA, ESG).

Source: TheArtOfService Knowledge Graph | 11 controls analysed | 718 frameworks | 332K+ cross-framework mappings

Control Mappings

Showing 20 of 23 mapped controls across 3 domains. Sign up to explore all 332K+ mappings across 718 frameworks.

HKMA SPM: Corporate Governance (CG-1/2/3/5/6), Internal Control (IC-1/5), Auditing (AC-G)(1 mappings)

HKMA-SPM-CG-IC-AC-Governance-Control-AuditHKMA SPM Corporate Governance (CG-1/2/3/5/6), Internal Control (IC-1/5), Auditing (AC-G)
CPS234-05Roles and responsibilities definition

HKMA SPM: Operational Risk (OR-1), Operational Resilience (OR-2), Recovery Planning (RR-1), Outsourcing (SA-2)(11 mappings)

HKMA-SPM-OR-RR-SA-OperationalResilienceHKMA SPM Operational Risk (OR-1), Operational Resilience (OR-2), Recovery Planning (RR-1), Outsourcing (SA-2)11 targets
CPS234-11Business continuity planning and testing
CPS234-12Disaster recovery procedures
CPS234-14Roles and Responsibilities
CPS234-14Roles and Responsibilities
CPS234-15Information Security Capability
CPS234-15Information Security Capability
CPS234-16Capability of Third Parties
CPS234-16Capability of Third Parties
CPS234-18Ongoing monitoring and assessment
CPS234-20Information Asset Identification and Classification
CPS234-20Information Asset Identification and Classification

HKMA SPM: Technology Management Modules (TM-G-1 to TM-G-4, TM-E-1 e-Banking) + Coordination with C-RAF(8 mappings)

HKMA-SPM-TM-Technology-TM-G-1-CRAF-CoordHKMA SPM Technology Management Modules (TM-G-1 to TM-G-4, TM-E-1) + Coordination with C-RAF8 targets
CPS234-06Network security and segmentation
CPS234-07Endpoint protection and detection
CPS234-08Application security controls
CPS234-09Encryption and key management
CPS234-10Secure configuration standards
CPS234-21Implementation of Controls
CPS234-21Implementation of Controls
CPS234-23Frequency and Methodology of Testing

+3 more mappings

Plus AI-powered gap analysis, compliance advisory, PDF exports, and cross-mapping for all 718 frameworks.

Create Free Account →

Free forever — no credit card required

Stop Paying Consultants to Read Spreadsheets

AI-powered compliance intelligence across 718 frameworks — at a fraction of consulting costs.

$0/forever

Free

  • 718 framework browser
  • Cross-framework mappings (332K+)
  • 824 compliance assessments
  • 3 AI queries & searches per day
Get Started Free
Recommended
$49/month

Professional

  • Unlimited AI Compliance Advisory
  • Unlimited full-text search
  • Framework self-assessment
  • PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between HKMA SPM and APRA CPS 234?

HKMA SPM has 11 controls across its framework, while APRA CPS 234 covers 35 controls. Direct mapping analysis identifies 3 overlapping controls (27% coverage). The frameworks diverge most significantly in HKMA SPM: International Coordination (BCBS, IOSCO, FSB), 2024-2025 Pipeline (Climate, AI, DORA, ESG), where 4 HKMA SPM controls have no direct APRA CPS 234 equivalent.

How many controls map between HKMA SPM and APRA CPS 234?

Of 11 total HKMA SPM controls, 3 map directly to APRA CPS 234 controls — representing 27% coverage. The remaining 8 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping HKMA SPM to APRA CPS 234?

8 HKMA SPM controls have no direct equivalent in APRA CPS 234. The highest concentration of gaps is in HKMA SPM: International Coordination (BCBS, IOSCO, FSB), 2024-2025 Pipeline (Climate, AI, DORA, ESG) with 4 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between HKMA SPM and APRA CPS 234?

The domain with the highest gap count is HKMA SPM: International Coordination (BCBS, IOSCO, FSB), 2024-2025 Pipeline (Climate, AI, DORA, ESG) (4 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are AI-assisted interpretations and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.