Cross-Framework Mapping

APRA CPS 230 Operational Risk ManagementvsSingapore Government Instruction Manual on ICT&SS Management (IM8)

See exactly how APRA CPS 230 Operational Risk Management controls map to Singapore Government Instruction Manual on ICT&SS Management (IM8). Pre-computed mappings, identified gaps, and coverage analysis.

10
Controls Mapped
33
Gaps Found
19%
Coverage

Need this as a report you can hand to an assessor? A coverage crosswalk for this pair can be built to order.

According to the TheArtOfService Compliance Knowledge Graph:

APRA CPS 230 Operational Risk Management maps to Singapore Government Instruction Manual on ICT&SS Management (IM8) with 19% coverage across 8 directly mapped controls. Analysis of 43 APRA CPS 230 Operational Risk Management controls identifies 35 compliance gaps, primarily concentrated in Operational Risk Management Framework.

Source: TheArtOfService Knowledge Graph | 43 controls analysed | 686 frameworks | 309K+ cross-framework mappings

Control Mappings

Showing 10 of 10 mapped controls across 3 domains. Sign up to explore all 309K+ mappings across 686 frameworks.

Operational Risk Management Framework(3 mappings)

CPS230-11Identification, Assessment and Management of Operational Risk
IM8-SEC.4Vulnerability Management
CPS230-13Board Accountability for Operational Risk Management
IM8-RES.3Incident Response
CPS230-16Internal Audit Review of the Business Continuity Plan
IM8-TPM.4Supply Chain Risk Management

Business Continuity(4 mappings)

CPS230-26Critical Operations Register, Continuity Plan and Activation3 targets
IM8-RES.1Business Continuity Planning
IM8-RES.2Disaster Recovery
IM8-RES.4Resilience Testing
CPS230-27Identification and Escalation of Incidents and Near Misses
IM8-TPM.4Supply Chain Risk Management

Service Provider Management(3 mappings)

CPS230-37Service Provider Management Policy
IM8-TPM.4Supply Chain Risk Management
CPS230-46Ongoing Risk Management of Each Material Arrangement
IM8-TPM.4Supply Chain Risk Management
CPS230-49Internal Audit Review of Proposed Critical Operation Outsourcing
IM8-TPM.4Supply Chain Risk Management
Coverage crosswalk

A APRA CPS 230 Operational Risk Management to Singapore Government Instruction Manual on ICT&SS Management (IM8) crosswalk, built to order

The table above lists candidate mappings. A crosswalk answers the narrower question you are probably here for: which Singapore Government Instruction Manual on ICT&SS Management (IM8) controls your existing APRA CPS 230 Operational Risk Management work already satisfies, which are real gaps, and the reasoning behind every claim so you can check it. One pair, $299, one time.

APRA CPS 230 Operational Risk Management into Singapore Government Instruction Manual on ICT&SS Management (IM8)
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

Singapore Government Instruction Manual on ICT&SS Management (IM8) into APRA CPS 230 Operational Risk Management
Not published yet

This direction has not been through crosswalk review and sign off, so no coverage figure is published for it. Reporting an unreviewed number would be worse than reporting none. It can be built to order at the same price as a pair that is already on the shelf.

If the two frameworks turn out to have too little in common for a crosswalk to help you, we say so and refund it rather than send a number worth nothing.

APRA CPS 230 Operational Risk Management to Singapore Government Instruction Manual on ICT&SS Management (IM8) (built to order)
$299
per framework pair, one time
  • Every evidenced control, with the reasoning behind it
  • Every gap, with what it requires
  • Its level of review stated plainly, not a bare number

Why this page shows two different percentages. The 19% in the header counts how many APRA CPS 230 Operational Risk Management controls carry at least one candidate mapping in the graph, before any review. The crosswalk percentage counts something stricter: how many Singapore Government Instruction Manual on ICT&SS Management (IM8) controls are actually evidenced, after a pass that argued against each mapping and kept only what survived. They answer different questions and they are not meant to agree.

A crosswalk narrows the work. It does not replace an audit, and your assessor may take a different view on individual controls. Mappings between frameworks are judgements, not text printed in either standard, which is why every claim in the report shows its reasoning. Questions go to support@theartofservice.com.

Related Comparisons

Other APRA CPS 230 Operational Risk Management comparisons

Other Singapore Government Instruction Manual on ICT&SS Management (IM8) comparisons

Stop Paying Consultants to Read Spreadsheets

AI-powered compliance intelligence across 686 frameworks, at a fraction of consulting costs.

$0/forever

Free

  • 686 framework browser
  • Cross-framework mappings (309K+)
  • 824 compliance assessments
  • 3 AI queries & searches per day
Get Started Free
Recommended
$149/month

Professional

  • Unlimited AI Compliance Advisory
  • Unlimited full-text search
  • Framework self-assessment
  • PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between APRA CPS 230 Operational Risk Management and Singapore Government Instruction Manual on ICT&SS Management (IM8)?

APRA CPS 230 Operational Risk Management has 43 controls across its framework, while Singapore Government Instruction Manual on ICT&SS Management (IM8) covers 44 controls. Direct mapping analysis identifies 8 overlapping controls (19% coverage). The frameworks diverge most significantly in Operational Risk Management Framework, where 9 APRA CPS 230 Operational Risk Management controls have no direct Singapore Government Instruction Manual on ICT&SS Management (IM8) equivalent.

How many controls map between APRA CPS 230 Operational Risk Management and Singapore Government Instruction Manual on ICT&SS Management (IM8)?

Of 43 total APRA CPS 230 Operational Risk Management controls, 8 map directly to Singapore Government Instruction Manual on ICT&SS Management (IM8) controls, representing 19% coverage. The remaining 35 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping APRA CPS 230 Operational Risk Management to Singapore Government Instruction Manual on ICT&SS Management (IM8)?

35 APRA CPS 230 Operational Risk Management controls have no direct equivalent in Singapore Government Instruction Manual on ICT&SS Management (IM8). The highest concentration of gaps is in Operational Risk Management Framework with 9 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between APRA CPS 230 Operational Risk Management and Singapore Government Instruction Manual on ICT&SS Management (IM8)?

The domain with the highest gap count is Operational Risk Management Framework (9 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are AI-assisted interpretations and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.