For amusement structures covered by AS 3533.1, other than those that standard classes as class 1, the person managing or controlling it must log: any item of plant registration number; any design registration number; the manufacturer's statement of its patron eligibility criteria; the date, location and details of each erection; the date, location, conditions and details of each storage; all inspection, maintenance and testing; hours operated on each day of use; total hours operated since 29 July 2026; faults or other safety matters found in operation, inspection, maintenance or testing, and any action taken on them; for each operator, full name and whether trained and instructed in proper operation, with the date, a summary and the trainer's name and qualifications or experience for every training occasion; and each statutory notice or inspector direction with its date, reasons, response, whether complied with or withdrawn and, for a corresponding Authority notice, where the structure was. Logbook and manuals must stay with the structure, open to the Authority at all times. Penalty: 60 or 300 penalty units.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.