Where plans and specifications form part of the contract, the contractor warrants the work will follow them (s 23); for erecting a detached dwelling, or renovating, altering, extending, improving or repairing a home, to a stage suitable for occupation, it warrants the dwelling or home will be suitable for occupation when finished (s 24); and it warrants the work will be carried out with reasonable diligence (s 25).
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.