The contractor under a regulated contract must not start providing the contracted services before the contract meets the requirements of s 13 (level 1) or s 14 (level 2). Maximum penalty 100 penalty units.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.