No boiler is installed or operated in the Philippines without a permit issued by the Secretary of Labor or an authorised representative. Applications to install a new boiler are filed with the Bureau or Regional Office with the maker's data sheets, the working drawings, the foundation design and the installation and location plans in five copies, applications to fabricate locally are filed with design drawings and computations, major repairs to pressure parts are cleared in advance by the Bureau or the Regional Office and the boiler is not used afterwards without a permit, and any removal, relocation or change of ownership is reported by old and new owners within thirty days. Power boiler rooms have at least 100 cm clearance, two independent doors and fire-resistant construction or separation as Rule 1163 requires, with no openings into rooms where flammables are handled; power boilers, heating boilers, cleaning and repair, personal protective equipment, colour coding and the plan requirements for boilers and pressure vessels follow Rules 1163 to 1168, including the periodic inspections and tests on which the permit depends.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.